Laserfiche WebLink
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> System Impact Study Agreement <br /> THIS AGREEMENT is made and entered into this day of 20 by and <br /> between , ("Interconnection <br /> Customer"), and , a municipal utility <br /> existing under the laws of the State of Minnesota, ("Area EPS Operator"). Interconnection <br /> Customer and Area EPS Operator each may be referred to as a "Party," or collectively as the <br /> "Parties." <br /> RECITALS <br /> WHEREAS, the Interconnection Customer is proposing to develop a Distributed Energy <br /> Resource (DER) or generating capacity addition to an existing DER consistent with the <br /> Interconnection Application completed by the Interconnection Customer <br /> on (date); and <br /> WHEREAS, the Interconnection Customer desires to interconnect the DER with the Area EPS <br /> Operator's Electric System; S <br /> WHEREAS, the Interconnection Customer has requested the Area EPS Operator to perform a <br /> System Impact Study to assess the impact of interconnecting the DER with the Area EPS <br /> Operator's Electric System, and potential Affected System(s); <br /> NOW,THEREFORE, in consideration of, and subject to, the mutual covenants contained herein <br /> the Parties agreed as follows: <br /> 1. When used in this Agreement, with initial capitalization, the terms specified shall have <br /> the meanings indicated, or the meanings specified, in the Municipal Minnesota <br /> Distributed Energy Resources Interconnection Process (M-MIP). <br /> 2. The Interconnection Customer elects and the Area EPS Operator shall cause to be <br /> performed a System Impact Study consistent with the M-MIP.The scope of a System <br /> M-MIP System Impact Study Agreement_January 2019 1 <br /> 244 <br />