My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> System Impact Study Agreement <br /> THIS AGREEMENT is made and entered into this day of 20 by and <br /> between , ("Interconnection <br /> Customer"), and , a municipal utility <br /> existing under the laws of the State of Minnesota, ("Area EPS Operator"). Interconnection <br /> Customer and Area EPS Operator each may be referred to as a "Party," or collectively as the <br /> "Parties." <br /> RECITALS <br /> WHEREAS, the Interconnection Customer is proposing to develop a Distributed Energy <br /> Resource (DER) or generating capacity addition to an existing DER consistent with the <br /> Interconnection Application completed by the Interconnection Customer <br /> on (date); and <br /> WHEREAS, the Interconnection Customer desires to interconnect the DER with the Area EPS <br /> Operator's Electric System; S <br /> WHEREAS, the Interconnection Customer has requested the Area EPS Operator to perform a <br /> System Impact Study to assess the impact of interconnecting the DER with the Area EPS <br /> Operator's Electric System, and potential Affected System(s); <br /> NOW,THEREFORE, in consideration of, and subject to, the mutual covenants contained herein <br /> the Parties agreed as follows: <br /> 1. When used in this Agreement, with initial capitalization, the terms specified shall have <br /> the meanings indicated, or the meanings specified, in the Municipal Minnesota <br /> Distributed Energy Resources Interconnection Process (M-MIP). <br /> 2. The Interconnection Customer elects and the Area EPS Operator shall cause to be <br /> performed a System Impact Study consistent with the M-MIP.The scope of a System <br /> M-MIP System Impact Study Agreement_January 2019 1 <br /> 244 <br />
The URL can be used to link to this page
Your browser does not support the video tag.