My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Area EPS Operator. The Area EPS Operator shall provide such authorization within <br /> three (3) Business Days from when the Area EPS Operator receives notification that the <br /> Interconnection Customer has complied with all applicable parallel operations <br /> requirements and commissioning has been successfully completed. Such authorization <br /> shall not be unreasonably withheld, conditioned or delayed. <br /> 9.9. Continual Compliance <br /> The Interconnection Customer shall be fully responsible to operate, maintain, and <br /> repair the DER as required to ensure that it complies at all times with the <br /> interconnection standards to which it has been certified.The Interconnection <br /> Customer shall also operate its DER system in compliance with the Area EPS Operator's <br /> technical requirements referred to in the executed Interconnection Agreement.The <br /> Area EPS Operator may periodically inspect, at its own expense, the operation of the <br /> DER system as it relates to power quality, thermal limits and reliability. Failure by the <br /> Interconnection Customer to remain in compliance with the technical requirements will <br /> result in the disconnection of the DER system from the Area EPS Operator's <br /> Distribution System. <br /> 9.10. Disconnection of DER <br /> The Area EPS Operator has the right to disconnect the DER in the event of the <br /> following: <br /> • Does not continue to follow and maintain IEEE 1547 settings approved by the Area <br /> EPS Operator as indicated by the adopted technical requirements. <br /> • Does not meet all the requirements of the Fast Track Process. <br /> • Refuses to sign either the MMIA or the Area EPS Operator's Uniform Contract. <br /> The Area EPS Operator may temporarily disconnect the DER upon the following <br /> conditions: <br /> • For scheduled outages upon reasonable notice. <br /> • For unscheduled outages or emergency conditions. <br /> • If the DER does not operate in the manner consistent with the Fast Track Process. <br /> The Area EPS Operator shall inform the Interconnection Customer in advance of any <br /> scheduled disconnections, or as reasonable, after an unscheduled disconnection. <br /> 19 <br /> 199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.