Laserfiche WebLink
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> • An additional 1/3 of estimated costs shall be due prior to initial energization of <br /> the DER with the Area EPS Operator. <br /> • Remainder of actual costs, incurred by Area EPS Operator, shall be due within <br /> thirty (30) Business Days from the date the bill is mailed by the Area EPS <br /> Operator after project completion. <br /> Under the Modified Security method, at least twenty (20) Business Days prior to the <br /> commencement of the design, procurement, installation, or construction of a discrete <br /> portion of the Area EPS Operator's Interconnection Facilities and Upgrades, the <br /> Interconnection Customer shall provide the Area EPS Operator, at the Interconnection <br /> Customer's option, a guaranty, letter of credit or other form of security that is <br /> reasonably acceptable to the Area EPS Operator and is consistent with the Minnesota <br /> Uniform Commercial Code. Such security for payment shall be in an amount sufficient <br /> to cover the costs for constructing, designing, procuring, and installing the applicable <br /> portion of the Area EPS Operator's Interconnection Facilities and Upgrades and shall be <br /> reduced on a dollar-for-dollar basis for payments made to the Area EPS Operator under <br /> the Interconnection Agreement during its term. <br /> The guaranty must be made by an entity that meets the creditworthiness requirements <br /> of the Area EPS Operator and contain terms and conditions that guarantee payment of <br /> any amount that may be due from the Interconnection Customer, up to an agreed-to <br /> maximum amount. <br /> The letter of credit must be issued by a financial institution or insurer reasonably <br /> acceptable to the Area EPS Operator and must specify a reasonable expiration date not <br /> sooner than sixty(60) Business Days (three calendar months) after the due date of the <br /> final accounting report and bill described in Section 9.5 <br /> 9.7. Non-Warranty <br /> Area EPS Operator does not give any warranty, expressed or implied, as to the <br /> adequacy, safety, or other characteristics of any structures, equipment, wires, <br /> appliances or devices owned, operated, installed or maintained by the Interconnection <br /> Customer, including without limitation the DER and any structures, equipment, wires, <br /> appliances or devices not owned, operated or maintained by the Area EPS Operator. <br /> The Area EPS Operator does not guarantee uninterrupted power supply to the DER and <br /> will operate the Distribution System with the same reliability standards for the entire <br /> customer base. <br /> 9.8. Authorization for Parallel Operation <br /> The Interconnection Customer shall not operate its DER system in parallel with the <br /> Area EPS Operator's Distribution System without prior written authorization from the <br /> 18 <br /> 198 <br />