My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> 1 Applicability <br /> 1.1. Capacity Limit <br /> The Fast Track Process is available to an Interconnection Customer proposing to <br /> interconnect a Distributed Energy Resource (DER)with the Area EPS Operator's <br /> Distribution System if the DER capacity does not exceed the size limits in Table 1.1 and <br /> does not qualify for the Simplified Process. The capacity is determined by the <br /> aggregated summation of the Nameplate Rating of all components that make up the <br /> DER system. Additional information regarding the capacity limits can be seen in Section <br /> 6 of the Process Overview document. <br /> Table 1.1. Fast Track Eligibility for DER <br /> 1 Fast Track Eligibility for certified, <br /> Fast Track Eligibility z <br /> inverter-based DER on a Mainline <br /> Line Voltage Regardless of <br /> and <_2.5 Electrical Circuit Miles from <br /> Location <br /> Substation3 <br /> < 5 kV <_500 kW <_500 kW <br /> >_ 5kV and < 15kV <_ 1MW 52MW <br /> >_ 15kV and <30kV <_3MW 54MW <br /> >_30kV and <_69kV <_4MW <_ 5MW <br /> Fast Track eligibility for DERs is determined based upon the generator type, the size of <br /> the generator, voltage of the line, and the location of and the type of line at the Point <br /> of Common Coupling. All synchronous and induction machines must be no larger than 2 <br /> MW to be eligible for Fast Track Process consideration. Fast Track eligibility does not <br /> imply or indicate that a DER will pass the engineering screens or be exempt from the <br /> proposed DER Interconnection being placed into the Study Process. <br /> 1.2. Codes, Standards and Certification Requirements <br /> The Interconnection Customer's proposed DER must meet the codes, standards and <br /> certification requirements listed in Section 14 and Section 15 of the Overview Process <br /> document.The Area EPS Operator may allow DER systems that do not meet codes, <br /> standards and certification only if the DER system design is reviewed and tested and <br /> determined that it is safe to operate in parallel with the Distribution System. <br /> 1 Synchronous and induction machine eligibility is limited to no more than 2 MW even when line voltage is greater <br /> than 15 kV. <br /> 2 For purposes of this table,a Mainline is the three-phase backbone of a circuit. It will typically constitute lines with <br /> wire sizes of 4/0 American wire gauge,266 kcmil,336.4 kcmil,397.5 kcmil,477 kcmil and 795 kcmil. <br /> 3 An Interconnection Customer can determine this information about its proposed interconnection location in <br /> advance by requesting a pre-application report described in the Overview Process document. <br /> 1 <br /> 181 <br />