Laserfiche WebLink
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> 6.3. Proof of Insurance 13 <br /> 7 Timeline Extensions 13 <br /> 7.1. Reasonable Efforts 13 <br /> 7.2. Extensions 13 <br /> 8 Modifications to Application 13 <br /> 8.1. Procedures 13 <br /> 8.2. Timelines 14 <br /> 9 Interconnection 14 <br /> 9.1. Interconnection Milestones 14 <br /> 9.2. Metering 15 <br /> 9.3. Construction 15 <br /> 9.4. Inspection, Testing and Commissioning 15 <br /> 9.5. Interconnection Costs 16 <br /> 9.6. Security of Payment 17 <br /> 9.7. Non-Warranty 18 <br /> 9.8. Authorization for Parallel Operation 18 <br /> 9.9. Continual Compliance 19 <br /> 9.10. Disconnection of DER 19 <br /> ii <br /> 180 <br />