<br />5 <br /> <br /> <br />IX. FINANCING <br /> <br />It is the City's intent to assess all costs associated with the improvement against the <br />benefiting property. Since the property is own~d by the EDA, the City will be assessing <br />itself. It is the City's intent to use the proceeds from Tax Increment Financing (TIF) <br />and/or Tax Rebate as lots are developed to pay the assessments. <br /> <br />In discussions with Cathy Mehelich, Director of Economic Development and Lori <br />Johnson, Finance Director the major financial issue is the timing of cash flow from TIF <br />and/or Tax Rebate proceeds to retire the debt versus the desire to have marketable lots <br />for industrial prospects. There are two options to address these canpeting issues. <br />They are as follows: <br /> <br />1. Proceed with design of the plans and specifications for the entire development <br />and the preliminary platting of the property, but do not bid or begin construction <br />until there is at least one significant lot development proposed. If plans and <br />specifications are complete a bid could be sought and construction could begin <br />within 45 - 60 days. <br />2. A second option would be similar to the first with the exception that the City could <br />proceed with bidding and construction of the underground utilities in the first <br />phase but not the street component, (project cost estimated at $250,000) then <br />when a prospect is ready to begin only the street component would need to be <br />bid and built. If the development of a lot occurs prior to completion of the street. <br />component temporary access to Twin Lakes Road could be allowed. <br /> <br />Either ofthese options would help minimize the financial risk of lacking cash flow needed <br />to retire the debt incurred with development of Northstar Business Park. <br /> <br />X. ECONOMIC DEVELOPMENT AUTHORITY <br /> <br />On May 9, 2005 a draft version of this report was presented to the Economic <br />Development Authority. After lengthy discussion of the various options from full <br />development of the entire Northstar Business Park to do nothing and wait for a <br />significant prospect, the EDA passed a motion unanimously to recommend to the City <br />Council that Option 2 described above be followed. That option would proceed with <br />preparation of plans for the entire area but only bid and construct the underground <br />utilities in the first phase. After industrial prospects are identified to generate significant <br />proceeds to retire the debt, then finish construction in the first phase. Finally, future <br />phases would proceed to construction as development of the lots in the first phase <br />occurs. <br /> <br />XI. PROJECT SCHEDULE <br /> <br />Cathy Mehelich, Director of Economic Development, has identified the first prospect that <br />agreed to locate in the Northstar Business Park. This prospect is anticipated to build <br />approximately a 20,000 square foot building to be located on Lot 6. The following <br />schedule assumes the need to have utility construction complete for a fall/winter <br />occupancy. <br />