Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Planning Commission Minutes <br />August 24. 1999 <br />Page 9 <br /> <br />12. SURFACE WATER MANAGEMENT FEE IN THE AMOUNT REQUIRED BY THE CITY AT <br />THE TIME OF FINAL PLAT BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING <br />WITH SHERBURNE COUNTY. <br /> <br />13. PARK DEDICATION FEE AND TRAIL FEE IN THE AMOUNT REQUIRED BY THE CITY AT <br />THE TIME OF FINAL PLAT BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING <br />WITH SHERBURNE COUNTY. <br /> <br />14. A GRADING AND EROSION CONTROL PLAN AND DEVELOPMENT PLAN BE <br />SUBMITTED AND APPROVED BY THE CITY ENGINEER PRIOR TO THE ISSUANCE OF <br />BUILDING PERMITS. <br /> <br />15. ALL LOTS SHALL HAVE A BUILDABLE AREA LARGE ENOUGH TO ACCOMMODATE <br />A 50 'X 50' BUILDING PAD AND A DISTANCE OF 30 FEET BETWEEN THE HOUSE <br />AND ANY WETLAND. <br /> <br />16. A SEALCOAT FEE IN THE AMOUNT TO BE DETERMINED BY THE CITY ENGINEER BE <br />PAID TO THE CITY PRIOR TO RELEASING THE PLAT FOR RECORDING WITH <br />SHERBURNE COUNTY. <br /> <br />17. A LANDSCAPE PLAN SHALL BE PROVIDED PRIOR TO FINAL PLAT. THE LANDSCAPE <br />PLAN SHALL INCLUDE FRONT YARD AND BOULEVARD TREES AS REQUIRED BY ELK <br />RIVER CITY ORDINANCE. <br /> <br />18. THAT A TEMPORARY CUL-DE-SAC IS INSTALLED AT THE NORTH END OF POLK <br />STREET NW IN THE PLAT AND AN EASEMENT BE DEDICATED FOR THE TEMPORARY <br />CU- DE-SAC. <br /> <br />19. MINIMUM SETBACK REQUIREMENTS FOR THE PRINCIPLE STRUCTURE SHALL BE AS <br />FOLLOWS: <br /> <br />FRONT YARD <br />SIDE YARD <br />GARAGE SIDE <br />REAR YARD <br /> <br />35 FEET <br />20 FEET <br />20 FEET <br />30 FEET <br /> <br />20. ACCESSORY STRUCTURE SETBACKS SHALL BE: <br /> <br />FRONT YARD <br />SIDE YARD <br />REAR YARD <br /> <br />35 FEET <br />20 FEET <br />30 FEET <br /> <br />21. THAT WETLAND MITIGATION BE FINALIZED PRIOR TO CITY COUNCIL REVIEW OF <br />THE PRELIMINARY PLAT. <br /> <br />22. THAT THE NUMBER OF LOTS BE REDUCED FROM THE REQUESTED 27 LOTS DOWN <br />TO 24 LOTS. <br /> <br />COMMISSIONER THOMPSON SECONDED THE MOTION. THE MOTION CARRIED 5-1. <br /> <br />COMMISSIONER KUESTER MOVED TO RECOMMEND APPROVAL OF THE REQUEST BY <br />BRIDGELAND DEVELOPMENT CO. FOR PRELIMINARY PLAT APPROVAL, CASE <br />