Laserfiche WebLink
*z=:_Elk River. <br />Municipal Utilities 2019 Utilities Fee Schedule <br />New Residential Electric Connection - Developer - Lot with ERMU water service <br />$475.00 <br />New Residential Electric Connection - Developer - Lot without ERMU water service <br />$575.00 <br />New Residential Electric Connection - Builder <br />$875.00 <br />New Wire Footages over 200' (per foot) <br />$4.00 <br />New Service Frost Trenching (per foot) <br />$5.00 <br />New Commercial & Industrial Electric Connection <br />50% <br />Service Upgrades or Additions for Existing Customers <br />100% <br />Minimum Temporary Electric Service Fee - Existing Transformer <br />$150.00 <br />Minimum Temporary Electric Service Fee - Without Existing Transformer <br />$500.00 <br />Street Light - 30' Decorative Pole with 6' Arm and Fixture <br />$1,850.00 <br />Street Light - 23' Decorative Pole with Traditionaire Fixture <br />$1,500.00 <br />Security Light - Wood Pole with Fixture <br />$975.00 <br />Security Light - Existing Pole <br />$125.00 <br />Pole Attachment Fee (per pole) <br />$6.50 <br />Water Access Charge = Water Connection Charge + Water Availability Charge <br />$3,764.00 <br />Water Connection Charge (Per Plumbing Unit) - Builder <br />$3,396.00 <br />Water Availability Charge (Per Plumbing Unit) - Developer <br />$368.00 <br />Abandoned Water Service <br />$2,500.00 <br />Hydrant Water Sales - Rental (per week) <br />$50.00 <br />Hydrant Water Sales - Units (per 1000 gallons) <br />$4.00 <br />Deposit for 5/8" Hydrant Meter <br />$150.00 <br />Deposit for 2 1/2" Hydrant Meter <br />$1,000.00 <br />Private Hydrant Maintenance Program Monthly Fee <br />$5.00 <br />ADMINISTRATIVE <br />Administrative Fee for Continued Submission of Checks After No -Check Notice Given <br />$20.00 <br />Billable Cost of Materials Markup <br />15% <br />Billable Labor Markup <br />55% <br />Billable Vehicle / Equipment (per employee per hour) <br />$30.00 <br />Commerical Application Fee <br />$20.00 <br />Electric Service Disconnect/Trip Fee - Meter Technician <br />$50.00 <br />Electric Service Disconnect/Trip Fee - Line Crew <br />$ 150.00 <br />Energy Audit <br />$150.00 <br />Meter Tampering Fee <br />$250.00 <br />Meter Testing Fee <br />$50.00 <br />NSF Fee <br />$20.00 <br />Penalty Amount <br />10% <br />Photocopies (per page) <br />$0.25 <br />Red Tag Handling Fee <br />$20.00 <br />Water Shut -Off Fee <br />$100.00 <br />Adopted by the Uhhher Commission on November 13, 2018 under authority perMinnesota Statmie 412361 <br />