My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 12-18-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2018
>
12-18-2018
>
5.2. PCSR 12-18-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2018 11:09:03 AM
Creation date
12/12/2018 11:06:15 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
12/18/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
are height restriction concerns as well. Structures along the Mississippi like this may not be <br />higher than 30 feet tall. <br /> <br />In order to offset negative environmental impacts resulting from deviations to the city and <br />state regulations additional environmentally beneficial practices will be required for this <br />PUD. <br /> Other existing primate vegetation should be preserved, above and beyond that <br />required by city code for tree planting. Incorporate diverse and sustainable <br />landscaping specifically along the bluff. <br /> Utilize all recycling and reuse options in the reconstruction and new construction of <br />the entire site reducing overall waste generation. <br /> Ensure proper space is planned for trash and recycling both inside and outside the <br />apartment buildings (carts, dumpsters, etc.). <br /> Utilize green building standards including energy efficient lighting, efficient <br />appliances, insulation and efficient HVAC systems. <br /> Incorporate electric vehicle readiness for parking on this project, including but not <br />limited to conduit and infrastructure for future public charging stations. It is <br />recommended that 5-10% of parking stalls have the capability to be converted into <br />charging stations in the future. <br /> Explore options for renewable energy generation on site. <br /> Incorporate additional water conservation practices above city stormwater <br />requirements such as green roofs, rain gardens, porous pavement, low maintenance <br />native landscaping or grey water systems. <br /> Staff reserves the right to continue review of all site, grading and utility plans. <br /> <br />Any additional comments provided by MnDOT or MnDNR will need to be addressed at that time. <br />Unaddressed comments will be included as conditions for approval. Staff reserves the right to <br />continue review of all site, grading and utility plans <br /> <br />Thank you, and please let me know if you have any questions. <br /> <br />Sincerely, <br /> Zack Carlton, Planning Manager <br />763.635.1035 <br />
The URL can be used to link to this page
Your browser does not support the video tag.