My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 12-18-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2018
>
12-18-2018
>
5.2. PCSR 12-18-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2018 11:09:03 AM
Creation date
12/12/2018 11:06:15 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
12/18/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Ordinance requires one covered parking stall per residential unit. The Riverwalk building <br />meets this requirement, but the Saxon Apartments do not. <br />12. The parking requirements to not include the storage component of the building. Floorplans <br />identifying square footage of the storage areas are required to review the parking <br />requirements. <br />13. Submit landscape plans for review and comment. This is a requirement for approval. <br />14. Submit lighting plans for review and comment. This is a requirement for approval. <br />15. Submit colored architectural elevations identifying material and color selections for all <br />elevations. Façade improvements/modifications to the existing Saxon building must be <br />detailed. This is a requirement for approval. <br />16. Include proposed signage on site plans and elevations. <br />17. The Saxon Apartments no longer provide emergency fire access to the rear of the building. <br />Please update the plans to demonstrate access for emergency vehicles. <br />18. Additional comments will be provided upon receipt of referenced plans and changes. <br />19. Staff reserves the right to continue review of all site, grading and utility plans. <br /> <br />Public Works: <br />1. Identify all existing utilities and corresponding drainage easements on an updated survey that <br />includes the lot lines shown on the updated plans. <br />2. A formal agreement for the proposed shared storm sewer system between the two <br />properties must be formalized in an easement and agreement. <br />3. Proposed lot lines must have standard drainage and utility easements dedicated. <br />4. Parking bump-outs are not permitted on the public roadway in front of the proposed 4-story <br />apartment building. <br />5. Sewer service shown off the north end of the 4-story apartment addition building extends <br />off of the proposed lot. All services (sewer and water) must remain within their own lot and <br />connect to the public system in the roadway adjacent to said lot. <br />6. Submit grading plans for the new 4-story apartment site. <br />7. Proposed contours must be shown in all areas. <br />8. Further detail grades on the grass pave area and the entrance to it from the paved drive lane. <br />9. Need to reestablish the capacity and functionality of the existing storm water pond below <br />bluff. It seems the proposed access drive is conflicting in location. <br />10. Detail the design of the retaining walls along south side of project. <br />11. Submit full updated civil/site plans for the proposed 4-story apartment building. <br />12. Show all proposed grades in dark solid lines. <br />13. Additional comments will be provided upon receipt of referenced plans and changes. <br />14. Staff reserves the right to continue review of all site, grading and utility plans. <br /> <br />Stormwater: <br />1. Stormwater management requirements need to be met as listed in Ordinance <br />Sec. 78-503. - Stormwater and urban runoff control. and Sec. 78-504. - Post <br />construction stormwater management for proposed impervious surfaces. http://mn-\ <br />elkriver.civicplus.com/DocumentCenter/View/3180 <br />2. Explain in detail the pre and post impervious surface is sq. ft. in the submitted stormwater <br />report. Also, separate the projects as phase 1 and phase 2 or explain the how the stormwater <br />infrastructure works together. <br />3. Within the stormwater report, include pre and post for volume and water quality treatment.
The URL can be used to link to this page
Your browser does not support the video tag.