Laserfiche WebLink
<br />dictated the failure of the bond issue in November of 2004 that included a timely solution <br />to this issue. <br /> <br />Extending the interim use permit for six temporary classrooms at Elk River High School <br />will not adversely affect the hea1~ safety or welfare of the residences of the Elk River <br />area or the neighborhood surrounding the Elk River High School campus. On the <br />contrary, an extension of the interim use permit will better enable Independent School <br />District #728 to serve the needs of the secondary school students from the community <br />who attend Elk River High School. <br /> <br />Independent School District #728 requests that an extenSion of the interim use permit for <br />six temporary classrooms at Elk River High School be allowed through June of2010. <br /> <br />Submitted March 28, 2005 <br /> <br />~~ <br /> <br />BrentW.Orr <br />Director of School Operations <br />