Laserfiche WebLink
Elk River Public Library Board Page 3 <br /> July 24th,2018 <br /> • 5.4 Building Maintenance Report <br /> • Robbie said that building maintenance did come and spray for ants at the back <br /> door. Willie stated that Tim had noted that the cracks were inspected and that it <br /> was determined nothing would be done at this time. Those present then read <br /> Tim Sevcik's e-mail about the Library Zone updates. Dawn explained that this e- <br /> mail came in the day before the meeting and was too late to be included in the <br /> original meeting packet. <br /> • Willie questioned the drainage word on Gary's report that had nothing after it. <br /> The board asked Dawn to follow up with Gary and see if this was intent ally left <br /> empty or if it was an update to the zone report. <br /> 5.5 Library Zones Report <br /> 5.5. a Projector Update <br /> • Robbie stated that she had some information on the CIP items. She <br /> contacted Jake in the City of Elk River's IT department who contacted <br /> Marco and gave an estimate. The quote is $8,430.67 for projector <br /> replacement. The projector itself is $6,000 and it will be an additional <br /> $809.50 for programming. Mary K. asked why it is so expensive. Rita <br /> asked if the community is charged for the room when they use it. <br /> Robbie said no but she believes the projector should be replaced due to <br /> the amount the library and community uses the room. Robbie said she <br /> believes it should be the #1 priority for next year. Mary K asked if the <br /> City checks other places for pricing. Rita said she thinks the city might <br /> have contract or something. Robbie will include it in the budget under <br /> capital outlay. <br /> 5.5. b Chairs and Upholstery Items <br /> • Robbie tried to contact Michael about the chairs but he was out on <br /> vacation. Robbie did some research and new chairs would be $180-$190 <br /> multiplied by 12 chairs. She will put those on capital outlay in the budget. <br /> If under$10,000 on budget she doesn't have to fill out any extra <br /> paperwork. For the caterpillar upholstery Robbie had looked around and <br /> found something similar for$900. She hasn't had time find someone to <br /> contact for reupholster. Mary asked if Robbie wants to re-upholster it <br /> for cheaper or to not replace it. Robbie said she does like the furniture <br /> so she does want to try and reupholster so the whole piece of furniture <br /> doesn't have to be replaced. Robbie will probably list the cost as higher <br /> so she can cover the whole replacement cost if that is needed. Rita asked <br /> if the City can itemize approval of the items or approve as a whole. <br /> Robbie said it has to be approved as a whole. CIP items 3 and 4 are being <br /> left open. <br /> 5.5. c Handicapped sign and misc. <br /> • The board asked about the handicapped sign that still has sandbags <br /> around it. Robbie said she is confident that Gary or Tim will take care of <br /> 1111 <br /> it. Robbie explained the difference between routine maintenance and <br /> things that are wrong or need to be fixed. The "broken"items outside <br /> P R W E R E R II <br /> MATURE <br />