My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 09-11-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
09-11-2018
>
5.3 ERMUSR 09-11-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 10:45:58 AM
Creation date
9/7/2018 2:58:35 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SP0178-2007 <br /> Inside of Tank or <br /> Vessel Grind Smooth <br /> i <br /> DO <br /> Inside of Tank or <br /> Vessel <br /> Rough <br /> Pinhole <br /> Undercut <br /> Cillti)\ <br /> DON'T <br /> FIGURE A2 <br /> All joints shall be continuous full-penetration porosity-free welds. In tanks and vessels that require a 100%holiday-free lining,all <br /> welds must be smooth with no holes, high spots, lumps, or pockets. Grinding is required to eliminate sharp edges and high <br /> spots. Weld metal shall be used to fill in undercut or pits. <br /> Inside of Tank <br /> or Vessel <br /> 4:27.. <br /> Elk AM <br /> DO DON'T <br /> FIGURE A3 <br /> All weld spatter shall be removed. <br /> 6 NACE International <br /> 189 <br />
The URL can be used to link to this page
Your browser does not support the video tag.