Laserfiche WebLink
SP0178-2007 <br /> APPENDIX A: <br /> Illustrations of Design, Fabrication,and Surface Finish Practices for Metal Tanks and Vessels to Be <br /> Lined for Immersion Service <br /> Full Seam Weld Skip VVeld Skip Weld <br /> .A0.1°. <br /> Inside <br /> " #00/ Tank or <br /> Inside of <br /> OP <br /> Vessel Tank or <br /> Vessel <br /> Round All Sharp Edges <br /> 4110117 <br /> per Paragraph 5.1. F. <br /> 2 Channels Back-to-Back <br /> DO DON'T DO WT <br /> FIGURE Al <br /> All construction involving pockets or crevices that do not drain or that cannot be properly abrasive blasted and lined shall be <br /> avoided. <br /> NACE International 5 <br /> 188 <br />