Laserfiche WebLink
+ � <br /> ,, 0. <br /> r <br /> 5 <br /> • -,=:, <br /> 5 . 0 ENGINEER' S COST ESTIMATES <br /> BSI has prepared a cost estimate for the City to use for budgeting purposes. Due to <br /> the age of the coating and the percentage of coating failure,the tower should be fully <br /> reconditioned in the next 1 to 2 years. <br /> The following cost estimate is based on a construction schedule of 11 weeks. An <br /> updated Engineer's Cost Estimate should be obtained within 12 months prior to <br /> bidding the project. <br /> 5.1 Interior Wet Structural Repairs $ 55,200 <br /> 5.2 Interior Wet Coating-Complete $117,000 <br /> Type of Coating—Zinc/Epoxy/Epoxy System <br /> 5.3 Interior Dry Structural Repairs $ 11,100 <br /> 5.3 Interior Dry—Complete Repair $ 39,000 <br /> Type of Coating—Zinc/Epoxy/Epoxy System <br /> 5.4 Grid bee GS-9 Mixer $ 15,000 <br /> 5.4 Exterior Structural Repairs $ 21,000 <br /> 5.5* Exterior Coating- Full Replacement $255,000 <br /> Type of Coating—Zinc/Epoxy/Urethane/Fluoropolymer System <br /> 5.6 Exterior Logo $ 10,000 <br /> 5.9 Mobilization $ 20,000 <br /> 6.0 Engineering Specifications and Inspection Fee $ 81,000 <br /> 6.1 2-Year Warranty $4,000 <br /> 6.1 Estimated Total Cost $628,300.00 <br /> *Includes cost for containment. Badger State Inspection,Inc. <br /> Report prepared and certified by: <br /> Robert E.Kollmer-Bob <br /> NACE Certified Coatings Inspector No.1291 <br /> 13 <br /> 140 <br />