My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 09-11-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
09-11-2018
>
5.3 ERMUSR 09-11-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 10:45:58 AM
Creation date
9/7/2018 2:58:35 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.5 Interior Dry 3.5.1 <br /> Structural Install a 4-inch diameter coax pipe from the upper cone plate to the roof. This pipe will <br /> be used to run the City's two (2) coaxes to the roof. <br /> Reroute the wireless antennas coaxial cables so they don't interfere with the drywell <br /> tube manway. See photo 26. <br /> Install a 5-foot high section of transition ladder welded next to each of the two (2) dry <br /> riser platform manways. See photo 27. This will bring the manways into OSHA <br /> compliance when climbing or descending the ladders. <br /> Replace the broken glass electrical globes. See photo 28. <br /> Replace the Aluminum jacket covering on the inlet/outlet pipe. Replace any damaged <br /> foam insulation from the removal and storage during the reconditioning. <br /> 3.6 Interior Dry 3.6.1 <br /> Coating The coating on the interior dry is the original coating when the tower was erected in <br /> 1993 and is now 25 years old and it is considered repairable based upon its age. <br /> However, areas that are subjected to sweating including the exterior of the inlet/outlet <br /> pipe should be completely reconditioned. <br /> The complete interior dry surfaces subjected to sweating interior of the drywell tube, <br /> the complete upper platform area and the exterior of the inlet/out pipe should be <br /> reconditioned at the same time the tower is next scheduled for reconditioning in the <br /> next 1 to 2 years. See photos 29 thru 38. Spot repair approximately 200 square feet <br /> of coating failures below the upper platform, to include the base plate and 2-feet of <br /> the lower cone plates. <br /> The coating Dry Film Thickness (DFT) on the interior of the drywell tube is from 8 to <br /> 14 mils with an average of 12 mils DFT. <br /> The coating Dry Film Thickness (DFT) on the interior of the cone and bowl plates is <br /> from 12 to 15 mils with an average of 13.5 mils DFT. <br /> The coating Dry Film Thickness (DFT) on the interior of the dry riser is from 8.8 to 14.6 <br /> mils with an average of 12.5 mils DFT. <br /> 8 <br /> 135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.