Laserfiche WebLink
D2020 Domestic Water Distribution 7.82 28,148.35 <br />7.82 28,148.35 <br />D2040 Rain Water Drainage 1.59 5,729.71 <br />1.44 5,183.31 <br />0.15 546.39 <br />D3050 Terminal & Package Units 8.48 30,511.19 <br />8.48 30,511.19 <br />D4010 Sprinklers 4.62 16,645.32 <br />4.62 16,645.32 <br />D4020 Standpipes 1.15 4,133.60 <br />1.15 4,133.60 <br />D5010 Electrical Service/Distribution 6.41 23,082.90 <br />1.64 5,905.68 <br />1.34 4,809.13 <br />3.44 12,368.10 <br />D5020 Lighting and Branch Wiring 10.95 39,437.09 <br />2.85 10,252.12 <br />0.4 1,438.52 <br />0.81 2,922.33 <br />6.9 24,824.12 <br />D5030 Communications and Security 1.78 6,408.08 <br />0.97 3,504.04 <br />0.81 2,904.04 <br />0% 0 0 <br />E1090 Other Equipment 0 0 <br />0% 0 0 <br />0% 0 0 <br />100% $201.44 $729,626.48  <br />10.00% $20.14 $72,962.65  <br />0.00% $0.00 $0.00  <br />0.00% $0.00 $0.00  <br />$221.58 $802,589.13  <br />SubTotal <br />Contractor Fees (General Conditions,Overhead,Profit) <br />Architectural Fees <br />User Fees <br />Total Building Cost <br />G Building Sitework <br />Overhead service installation, includes breakers, metering, 20' conduit &  <br />wire, 3 phase, 4 wire, 120/208 V, 400 A <br />Feeder installation 600 V, including RGS conduit and XHHW wire, 400 A <br />Switchgear installation, incl switchboard, panels & circuit breaker,  <br />120/208 V, 3 phase, 400 A <br />Receptacles incl plate, box, conduit, wire, 8 per 1000 SF, .9 watts per SF <br />Miscellaneous power, 1.5 watts <br />Central air conditioning power, 4 watts <br />Fluorescent fixtures recess mounted in ceiling, 1.6 watt per SF, 40 FC, 10  <br />fixtures @32watt per 1000 SF <br />Communication and alarm systems, fire detection, addressable, 25  <br />detectors, includes outlets, boxes, conduit and wire <br />Fire alarm command center, addressable without voice, excl. wire &  <br />conduit <br />E Equipment & Furnishings <br />F Special Construction <br />Wet standpipe risers, class III, steel, black, sch 40, 4" diam pipe, 1 floor <br />Gas fired water heater, commercial, 100< F rise, 500 MBH input, 480 GPH <br />Roof drain, CI, soil,single hub, 4" diam, 10' high <br />Roof drain, CI, soil,single hub, 4" diam, for each additional foot add <br />Rooftop, single zone, air conditioner, department stores, 10,000 SF, 29.17  <br />ton <br />Wet pipe sprinkler systems, steel, ordinary hazard, 1 floor, 10,000 SF <br />Elk River TH 10 and Lowell Redevelopment TIF Analysis <br />LHB Project No. 180477 Page 3 of 3 <br />Replacement Cost Report <br />Parcel T, Drug Store