My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 09-04-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
09-04-2018
>
4.3. SR 09-04-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 10:56:23 AM
Creation date
8/30/2018 10:56:04 AM
Metadata
Fields
Template:
City Government
type
CCM
date
9/4/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Total Consultant Cost <br />Bolton & Menk will perform the work as described in the RFP. We have included detailed fee spreadsheets as <br />TaskDeliverableHoursFees <br />1Feasibility report34$4,014 <br />2Topographic survey50$6,642 <br />3Public involvement and meetings28$3,176 <br />4Design, plans, and specifications159$19,085 <br />5Contract bidding and award14$1,714 <br />6Construction phase services528$62,394 <br />7Warranty inspection11$1,271 <br />Total Not-to-Exceed Proposed Fee824$98,296 <br />Insurance Certificate <br />Summary <br />Bolton & Menk has survey crews available to begin immediately, as well as engineers and technicians available to <br />begin preparation of the feasibility report upon receipt of award. <br />key resumes for your review. <br />If there are any questions, please contact me at the number listed below. <br />Sincerely, <br />Bolton & Menk, Inc. <br />Jason W. Cook, P.E. Kevin P. Kielb, P.E. <br />Project Manager Principal-in-Charge <br />(763) 200-2444(651) 968-7760 <br />Attachments: <br />•Analysis of Hours <br />•Fee Summary <br />•Standard Rate Table for 2018 <br />• <br />•Resumes <br />2019 Street Improvements | Elk River, Minnesota <br />
The URL can be used to link to this page
Your browser does not support the video tag.