Laserfiche WebLink
0% 0 0 <br />E1090 Other Equipment 0 0 <br />0% 0 0 <br />0% 0 0 <br />100% $236.82 $1,326,173.26  <br />10.00% $23.68 $132,617.33  <br />0.00% $0.00 $0.00  <br />0.00% $0.00 $0.00  <br />$260.50 $1,458,790.59 Total Building Cost <br />E Equipment & Furnishings <br />F Special Construction <br />G Building Sitework <br />SubTotal <br />Contractor Fees (General Conditions,Overhead,Profit) <br />Architectural Fees <br />User Fees <br />Elk River TH 10 and Lowell Redevelopment TIF Analysis <br />LHB Project No. 180477 Page 4 of 4 <br />Replacement Cost Report <br />Parcel X, Commercial Building