D2010 Plumbing Fixtures 1.99 11,128.03
<br />1.32 7,403.81
<br />0.07 412.52
<br />0.21 1,168.22
<br />0.20 1,139.88
<br />0.18 1,003.60
<br />D2020 Domestic Water Distribution 0.50 2,820.76
<br />0.50 2,820.76
<br />D2040 Rain Water Drainage 0.69 3,845.63
<br />0.30 1,697.74
<br />0.38 2,147.89
<br />D3050 Terminal & Package Units 8.48 47,461.85
<br />8.48 47,461.85
<br />D4010 Sprinklers 2.25 12,615.47
<br />0.81 4,513.59
<br />1.39 7,777.28
<br />0.06 324.60
<br />D4020 Standpipes 1.83 10,257.04
<br />0.16 902.91
<br />1.67 9,354.13
<br />D5010 Electrical Service/Distribution 20.76 116,266.83
<br />4.19 23,483.09
<br />11.16 62,515.00
<br />5.41 30,268.74
<br />D5020 Lighting and Branch Wiring 10.83 60,658.69
<br />1.38 7,739.44
<br />0.30 1,661.97
<br />0.62 3,496.81
<br />0.09 505.74
<br />0.94 5,260.87
<br />0.60 3,378.57
<br />6.90 38,615.29
<br />D5030 Communications and Security 2.59 14,496.18
<br />2.00 11,202.10
<br />0.14 767.82
<br />0.45 2,526.26
<br />Wet pipe sprinkler systems, steel, light hazard, each additional floor, 50,000 SF
<br />Water closet, vitreous china, bowl only with flush valve, wall hung
<br />Urinal, vitreous china, wall hung
<br />Lavatory w/trim, vanity top, PE on CI, 20" x 18"
<br />Service sink w/trim, PE on CI,wall hung w/rim guard, 24" x 20"
<br />Water cooler, electric, wall hung, dual height, 14.3 GPH
<br />Gas fired water heater, commercial, 100< F rise, 500 MBH input, 480 GPH
<br />Roof drain, CI, soil,single hub, 5" diam, 10' high
<br />Roof drain, CI, soil,single hub, 5" diam, for each additional foot add
<br />Rooftop, single zone, air conditioner, department stores, 10,000 SF, 29.17 ton
<br />Wet pipe sprinkler systems, steel, light hazard, 1 floor, 50,000 SF
<br />Motor feeder systems, three phase, feed to 200 V 5 HP, 230 V 7.5 HP, 460 V
<br />15 HP, 575 V 20 HP
<br />Standard High Rise Accessory Package 3 story
<br />Wet standpipe risers, class III, steel, black, sch 40, 6" diam pipe, 1 floor
<br />Wet standpipe risers, class III, steel, black, sch 40, 6" diam pipe, additional
<br />floors
<br />Overhead service installation, includes breakers, metering, 20' conduit & wire,
<br />3 phase, 4 wire, 120/208 V, 1200 A
<br />Feeder installation 600 V, including RGS conduit and XHHW wire, 1200 A
<br />Switchgear installation, incl switchboard, panels & circuit breaker, 120/208 V,
<br />3 phase, 1200 A
<br />Receptacles incl plate, box, conduit, wire, 2.5 per 1000 SF, .3 W per SF, with
<br />transformer
<br />Miscellaneous power, 1 watt
<br />Central air conditioning power, 4 watts
<br />Motor installation, three phase, 460 V, 10 HP motor size
<br />Motor installation, three phase, 460 V, 15 HP motor size
<br />Fluorescent fixtures recess mounted in ceiling, 1.6 watt per SF, 40 FC, 10
<br />fixtures @32watt per 1000 SF
<br />Communication and alarm systems, fire detection, addressable, 100 detectors,
<br />includes outlets, boxes, conduit and wire
<br />Fire alarm command center, addressable with voice, excl. wire & conduit
<br />Internet wiring, 2 data/voice outlets per 1000 S.F.
<br />Elk River TH 10 and Lowell Redevelopment TIF Analysis
<br />LHB Project No. 180477 Page 3 of 4
<br />Replacement Cost Report
<br />Parcel X, Commercial Building
|