My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 08-20-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
08-20-2018
>
4.3. SR 08-20-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 10:09:24 AM
Creation date
8/16/2018 10:09:05 AM
Metadata
Fields
Template:
City Government
type
CCM
date
8/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Justin Femrite, Public Works Director <br />August 8, 2018 <br />Page 2 <br />Jon will be available and will be the primary Construction Observer for this project. <br />From time to time,Jon may have to attend a meeting or visit a site for projects in <br />which he has been thoroughly involved and has first-hand knowledgeof a particular <br />situation.In these instances, Sam Morse or Andy Evans will be available to provide <br />construction observation services.It is anticipated that Jon will be available 95% of <br />the time during the contract period. <br />Sam Morse, P.E., Construction Observer.Samis a Construction Observer with 2 <br />years of construction observation experience at Hakanson Anderson and 6 years of <br />construction experienceoverall. Sam has experience in sanitary sewer construction, <br />watermain, street construction and reconstruction. Sam’s MnDOT certifications <br />include Level 1 Aggregate Production, Level 1 and 2 Butuminous Street, Concrete <br />Field, Erosion and StormwaterManagement, and ADA.Sam is also experienced in <br />AutoCAD drafting software and GIS software. Sam will be available in early <br />September and will effectively coordinate with the City, Contractors and developers as <br />needed. <br />Andy Evans, P.E.,Construction Observer. Andy has over a decade of construction <br />experience and is going on his third year as a construction observer with Hakanson <br />Anderson. Andy has gained extensive experience in the construction of sanitary <br />sewer, watermain, storm sewer, and streets. Andyholds his Mn/DOT certifications in <br />Bituminous, Concrete, Aggregate Base, and StormwaterManagement.Andy will be <br />available in mid August to serve the City of Elk River as needed. <br />PROPOSED COMPENSATION <br />It is proposed that the Construction Observation services will be invoiced on an hourly basis in <br />accordance with our standard Municipal Hourly Rates.The 2018 hourly rates for the staff identified <br />in this proposal are as follows: <br />Jon Halter, Senior Construction Observer / Construction Observer Manager$92/Hr <br />Sam Morse, Construction Observer$85/Hr <br />Andy Evans, Construction Observer$85/Hr <br />In addition to the hourly rate, mileage will be invoiced at the current IRS rate. All other costs, <br />such as cell phones, computers systems and inspection equipmentare included in our hourly rates. <br />We thank you for the opportunity to provide this proposal. If you have any questions,please feel free <br />to contact me at 763-852-0479 (direct) or shanen@haa-inc.com. <br />Sincerely, <br />Hakanson Anderson <br />____________________________ <br />Shane M. Nelson, P.E. <br />Vice President <br />
The URL can be used to link to this page
Your browser does not support the video tag.