Laserfiche WebLink
Section 4. Projected Energy Requirements — 2019 to 2033 <br /> This section discusses MMPA's historical and future energy <br /> requirements. <br /> Historical 1.8% Over the period 2004 to 2017, MMPA member energy requirements <br /> Energy Growth grew at a compound annual growth rate of approximately 1.8% for <br /> Rate all twelve MMPA members. <br /> The following graph shows historical MMPA member energy <br /> requirements for the years 2004 to 2017, the time period for which <br /> data is available for all twelve member cities. MMPA only served a <br /> portion of Shakopee's load until 2009. Therefore, the data has been <br /> adjusted to include all of Shakopee's load. MMPA has not <br /> historically served Elk River, but the data has been adjusted to <br /> include this load. <br /> Minnesota Municipal Power Agency <br /> Historical Member Energy Requirements (MWh) <br /> 3.000.000 <br /> 2.5 00.000 <br /> 2.000.000 <br /> T 1.500.000 <br /> 1,000.000 <br /> 500.000 <br /> 0 <br /> O X00 00� 0 0-� �OOQ 0�0 - 0' 0' �0�� 0 0 O~^ <br /> r r 1r r �r r r r �r ti ti <br /> MMPA Will Begin MMPA will start providing electric service to Elk River in October <br /> Serving Elk River in 2018. The significant step up in projected energy in 2018 and 2019 <br /> October 2018 is attributable to this load addition. <br /> 82 <br />