Laserfiche WebLink
To: <br /> Elk River Utilities Commission <br /> From: <br /> Water Superintendent <br /> Robert McCartney <br /> Re: <br /> Installing 10 in. water main valve at Sherburne Co. Rd. #30 <br /> crossing. <br /> At February 13, 1996 Utility Commission meeting water main <br /> valve placement was discussed in regards to safety of public <br /> and vehicles on State Highways and County Roads. <br /> It came to my attention that a new 10 in. water main was <br /> being connected with the development of Country Crossings <br /> Second Addition and that there was only one ( 1) water main <br /> valve being installed. The existing water main was not being <br /> used except for fire protection in the area and this <br /> connection would complete a loop of the existing water main. <br /> Looking at the plans I noticed that there was not a valve <br /> for at least 1,000 feet and would not a valve on both sides <br /> of the County Road. I called C. W. Houle Construction Co. <br /> in Plymouth, MN. (they are doing the water and sewer <br /> improvements in the Country Crossing Addition) and received <br /> a written quote of NOT TO EXCEED $1,950.00 to install an <br /> additional 10 in. valve in the existing water main on the <br /> South side of Sherburne Co. Rd. #30 this includes <br /> (excavation, Installation, back filling, and restoration of <br /> ditch with sod) . <br /> Repectfully <br /> , ...dr/ <br /> / 4e c .4"4111110 <br /> • <br /> Robe J. McCartne <br />