My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3.1
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2003
>
07-22-2003
>
Item 3.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 12:45:17 PM
Creation date
7/23/2018 12:45:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Setbacks <br /> • • Front— proposed Holt Street NW — 25 feet <br /> • Side — 30 feet <br /> • Rear—40 feet <br /> IV. NATURAL RESOURCE ANALYSIS <br /> A. Topography <br /> The site is located on the west side of U.S. Highway 169 and south of <br /> 197th Street, NW. The site elevations range from 1008 in the north portion <br /> of the site to 978 in the southeast corner. The site drainage generally <br /> flows from the north to the south with the exception of a drainage <br /> easement located in the west side of the property near the middle. <br /> B. Vegetation <br /> The project site is open with very sparse vegetation, except for a small <br /> group of trees in the extreme northwest corner and for the portion of the <br /> site within Lots 3 and 4 of Ridgewood East 3rd Addition that is heavily <br /> wooded. <br /> iC. Soils and Ground Water <br /> The soils, based on the Sherburne County soils survey, consist of sand <br /> and gravel. The open portion of the site appears to have been mined. <br /> Soil borings will be obtained to provide more detailed information on soil <br /> and ground water prior to construction. <br /> D. Wetlands <br /> A formal wetland delineation has not yet been done. The wooded area <br /> north of 194th Avenue contains two depressions, which may be wooded <br /> wetlands. <br /> V. STORMWATER MANAGEMENT <br /> The development plans show two stormwater basins for treatment and rate <br /> control of surface water runoff. These would comply with City standards. Based <br /> on the granular soils, these basins would not hold water unless they are lined. <br /> Unlined basins could serve as infiltration basins, if desired. The site has three <br /> existing drainage easements. These would need to be vacated and new <br /> easements provided at locations compatible with the development plan. Due to <br /> the flatness of a majority of the site and the granular soils, the drainage patterns <br /> • <br /> 2 <br /> C:\Documents and Settings\DPertl\Local Settings\Temporary Internet Files\OLK9\Morcon-Elk River Dev <br /> Narrative.623.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.