My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5.8 - 5.10
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2002
>
04-23-2002
>
Item 5.8 - 5.10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2018 3:10:43 PM
Creation date
7/16/2018 3:10:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nili A 41 <br /> 01"- <br /> illp <br /> .pir <br /> . Sherburne Countyi■■��=,;ti <br /> April 8, 2002 ���i't+ej <br /> PUBLIC WORKS DEPARTMENT ,x `t�'it. <br /> ■■i.r■..r. <br /> City of Elk River Rhonda F. Lewis, P.E. <br /> Attn: Michele McPherson 425 Jackson Avenue <br /> 13065 Orono Parkway Elk River, MN 55330 <br /> P.O. Box (763)241-7030.800-594-5208 <br /> 90 <br /> Elk River, MN 55330 <br /> RE: Marshes of Trott Brook Farms <br /> Dear Ms. McPherson; <br /> After reviewing the drawing for the Marshes of Trott Brook Farms we offer the following <br /> comments. The access points.for Trott Brook Parkway and Vance Drive with CSAH 13 will <br /> become four way intersections and are approved. <br /> 1. We require 60' of right of way be dedicated in fee title to Sherburne County. <br /> 2. We will require an access permit for each approved access location. <br /> 3. We will require a right turn lane be built to MnDOT standards on CSAH 13 at Trott <br /> Brook Parkway. <br /> III <br /> 4. Vance Street cannot be a thru street; it must be gated at the pipeline easement. <br /> a. At the intersection of CSAH 13 and Vance Street we require the developer to <br /> create (with signage and pavement marking) a right turn lane into the <br /> development, the center lane for northbound traffic and a left turn bay. Removal <br /> of some curbing north on this intersection will help this transition. <br /> b. Because of limited site distance and the confusion of the transition area we <br /> require tree removal to create a better site triangle. <br /> c. A No Left Turn sign (into the development) is required for southbound traffic. <br /> 5. The developer is responsible for the applicable signage fees to bring this segment of <br /> roadway into compliance. <br /> 6. The developer is responsible for pavement marking correction as required. <br /> 7. Any existing access within the boundary of the plat must be removed. The removal site <br /> and the slopes for the right turn lanes must be restored according to the enclosed detail. <br /> If you have any questions or concerns call me at 763-241-7034. <br /> Sincet`epy, al_ <br /> Richard D. Corbin <br /> Sherburne County Public Works <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.