Laserfiche WebLink
Mr. Scott Harlicker <br /> • <br /> April 17, 2002 <br /> Page Two <br /> This issue should be looked at in greater detail. If a street access cannot be provided <br /> across the gas lines, consideration should be given to connecting Vance Drive to Tyler <br /> Court through the wetland area. This would be consistent with the action taken on a recent <br /> plat, Windsor Park Third, where a street was required through the wetlands to eliminate a <br /> dead-end cul-de-sac. In that particular plat, the two issues that were slightly different are <br /> the streets in Windsor Park Third were public and there was no other means of emergency <br /> vehicle access provided. <br /> C. PRELIMINARY GRADING, DRAINAGE, AND EROSION CONTROL PLAN <br /> • This plan should be provided in a larger scale so that the detail of the grading can be <br /> reviewed. <br /> • There are several locations on this grading plan where relatively high (8 to 10 feet) <br /> retaining walls are proposed. This would include areas behind multi-family units, adjacent <br /> to wetland, and along both sides of Vance Street as it crosses the wetland to make the <br /> connection with Trott Brook Parkway. All of these retaining wall areas should be terraced <br /> so that the retaining walls are relatively short. <br /> • Emergency overflows need to be provided for catch basins at low points and all ponds. <br /> • Some additional easements need to be provided on the final plat for drainage which cannot <br /> be contained within prescribed drainage and utility easements. <br /> • • The cul-de-sac with the large island in the center of it on Smith Circle needs to be built to <br /> the new City standard for cul-de-sacs containing islands. A standard detail showing the <br /> minimum radii for these types of installations can be provided. <br /> D. PRELIMINARY UTILITY PLAN <br /> • A County permit will be required for the access point onto CSAH 13. We believe that the <br /> County has already given preliminary approval to the access point, but an actual permit will <br /> need to be issued for the construction. <br /> • Sufficient drainage and utility easements will need to be provided for all of the sanitary <br /> sewer and watermain serving the multi-family units from private to private roads. The <br /> storm sewer servicing the private roads will be considered a private utility and the <br /> responsibility of the association to maintain. <br /> If you have any questions regarding these comments, please call. <br /> Sincerely, <br /> Howard R. Green Company <br /> �j��%(� <br /> Terry J. Maurer, P.E. <br /> • TJM:tw <br /> Howarc R. Green Company <br /> Ltr 4-17-02 Harlicker.rev CONSULTING ENGINEERS <br />