Laserfiche WebLink
Memo to Planning Commisison/CU 02-09 <br /> March 26,2002 <br /> Page 2 <br /> • • City Hall Floor Plan <br /> • Utilities Floor Plan <br /> • West Elevation City Hall and Utilities <br /> • Building Elevations - Public Safety <br /> • Campus Illustration <br /> Analysis <br /> Building Expansion <br /> The current City Hall and Police Station,27,600 square feet,is proposed to be expanded in <br /> order to accommodate Elk River Municipal Utilities and the City Attorney. The Utilities <br /> addition (7,276 square feet) will be located on the northwest side of the building and will <br /> require the removal of the dumpster enclosure as well as electrical transformers. The City <br /> Attorney's expansion (1,749 square feet) will be located on the southwest corner of the <br /> building and will also include a small addition for an expanded Cable Television area. Both <br /> expansions meet the building setback requirements of the R1c zoning district. <br /> Public Safety Facility <br /> The Public Safety Facility, (43,725 square feet),will include Police,Fire,and the Emergency <br /> Operations Center. There will be basement that will house the EOC,the firing range,and <br /> • evidence room. A second story will be constructed as shell space that will allow future <br /> expansion for the Police Department. Located north of the proposed Police Station will be <br /> the Police impound lot,which will be enclosed by a six foot high concrete rock-face block <br /> wall. The Fire Station will have room for up to six fire vehicles. The building meets the <br /> setback requirements of the R1c zoning district. <br /> Site Impacts <br /> In order to construct the Public Safety Facility,Orono Road will be removed to the Gary <br /> Street intersection. This will create a common parking area for both facilities. As a result, <br /> the Park and Recreation Commission will be reviewing and evaluating the Orono Park <br /> Master Plan for recommended changes. <br /> Also in conjunction with this project will be the closure and reopening of medians in Orono <br /> Parkway. The berm and landscaped area in the medians will be lowered in order to improve <br /> visibility for vehicles entering or leaving the City Hall Complex. <br /> Parking Requirements <br /> In order to accommodate the buildings, the parking lot will be expanded. Twenty-five <br /> spaces will be located behind the Public Safety Facility,for police and fire staff. In addition, <br /> up to 12 garage spaces for squad cars may be constructed. <br /> • The total number of spaces required, based on gross building area is 212 (including <br /> bathrooms,storage,Council Chambers,etc). This does not include the building area of the <br /> S:\PLANNING\Case Files\CU 02-09 City Hall\3-26PCmemo.doc <br />