My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.2. SR 07-02-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
07-02-2018
>
10.2. SR 07-02-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 4:41:53 PM
Creation date
6/28/2018 4:34:42 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/2/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . , M13 <br /> Hoisington Koegler Group Inc. ©e <br /> 3. Multi-Use fields at Youth Athletic Complex expansion facility <br /> At a minimum, development of multi-use fields will require the development of the eastern <br /> access road, related parking, and rough grading, representing approximately$4.1 Million before <br /> any fields are constructed. <br /> Option 1: 4 Lighted Irrigated Natural Turf Fields and related roadways & parking- <br /> $4,100,000(Infrastructure) +$2,000,000 (Fields) _$6,100,000 <br /> Option 2: 4 Lighted Synthetic Turf Fields and related roadways & parking- <br /> $4,100,000(Infrastructure) +$6,200,000 (Fields) _$10,300,000 <br /> Excluding all necessary support infrastructure, the following costs are included for figuring out <br /> the desired mix of natural turf,synthetic, and lighting: <br /> a. Approximate cost of 1 Irrigated Natural Turf Field: $200,000 <br /> b. Approximate cost of 1 Synthetic Turf Field: $1,250,000 <br /> c. Approximate cost to light 1 full sized rectangle multi-use field: $300,000 <br /> 4. Additional lights <br /> a. First priority—Hales field if agreement with School District can be developed $260,000 <br /> b. Second priority—Youth Athletic Complex fields 1-6$1,320,000* <br /> 300'Softball Field:$200,000 <br /> 375'Baseball Field:$260,000 <br /> *Costs developed on a per field basis. Efficiencies may be realized through the sharing of <br /> light poles, etc. <br /> 5. Playground at existing Youth Athletic Complex facility$100,000 (Allowance) <br /> 6. Paved parking <br /> a. First priority—Youth Athletic Complex$1,650,000(existing YAC Softball, Baseball, & <br /> Football Facilities) <br /> b. Second priority Dave Anderson Athletic Complex$875,000(Fairground Improvements) <br /> c. Oak Knoll Athletic Complex$275,00(NW Parking Lot, Not Ivan Sand North Lot) <br /> 123 North Third Street, Suite 100 Minneapolis,Minnesota 55401 <br /> (612)338-0800 Fax(612)338-6838 <br />
The URL can be used to link to this page
Your browser does not support the video tag.