My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.2. SR 07-02-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
07-02-2018
>
10.2. SR 07-02-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 4:41:53 PM
Creation date
6/28/2018 4:34:42 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/2/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• . ©Lo <br /> Hoisington Koegler Group Inc. ©n <br /> TO: Michael Hecker, CPRP, Elk River Parks And Recreation Director <br /> FROM: Kevin Clarke, Hoisington Koegler Group Inc. <br /> SUBJECT: Park Priority Draft Cost Estimates <br /> DATE: 27 June 2018 <br /> Michael, <br /> Based on priorities established for further discussion,the following items have estimated costs <br /> provided. Costs include a project contingency and an engineering/design allowance. Where design <br /> allows for flexibility, cost ranges have been used to reflect what different levels of investment can <br /> achieve.These draft costs are based on available information and current prices, developed at a <br /> planning level, and are subject to change. <br /> Thank you, <br /> Kevin Clarke <br /> Hoisington Koegler Group Inc. <br /> 1. Restroom/Concession/Storage Facilities at the existing Youth Athletic Complex Facility <br /> $450,000—Functional Restroom/Concession Bldg., Storage in Separate Bldg. <br /> $750,000—Signature Restroom/Concession/Storage Bldg. <br /> 2. A Lighted Signature Ballfield (Covered Grandstand, Lights, Concession, Restrooms, Storage, <br /> Press/Scorer's Box) No land acquisition costs are assumed in either the Elk River Hales Field or <br /> YAC Expansion facility$2,000,000-$3,000,000 <br /> As a recent, local example, Castle Field in Anoka was bid and constructed for approximately$2.2 <br /> Million in 2012. Since then the economy has improved and labor and material costs have risen. <br /> a. First Priority—Hales Field if agreement with School District can be developed <br /> Assumes core of Hole's Field remains in current location <br /> b. Second Priority—Youth Athletic Complex Expansion facility <br /> YAC Expansion cannot occur without other significant costs(Road,parking, etc.)See item <br /> 3 for a discussion of necessary infrastructure costs. <br /> 123 North Third Street, Suite 100 Minneapolis,Minnesota 55401 <br /> (612)338-0800 Fax(612)338-6838 <br />
The URL can be used to link to this page
Your browser does not support the video tag.