My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2000
>
06-27-2000
>
5.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 4:07:01 PM
Creation date
5/7/2018 4:06:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Howarc R. Green Comoany <br /> CONSULTING ENGINEERS <br /> June 19, 2000 <br /> File: 809020J-0240 <br /> Ms. Michele McPherson <br /> Director of Planning <br /> City of Elk River <br /> 13065 Orono Parkway <br /> Elk River, Minnesota 55330 <br /> RE: K&L ADDITION <br /> CITY OF ELK RIVER <br /> Dear Ms. McPherson: <br /> We have reviewed the submittal package for the K&L Addition. As you are aware, this is a <br /> proposed plat just north of 173rd Avenue between Trunk Highway (TH) 10 and the Burlington <br /> Northern Railway. The submittal package was prepared by John Oliver and Associates and <br /> consisted of a Phase I three-page plan set and an Ultimate 3-page plan set. The three pages in <br /> • each set plan consisted of a preliminary plat, preliminary grading plan, and preliminary utility <br /> plan. Based on our review, we would offer the following comments: <br /> A. Preliminary Plat <br /> 1. The Phase I preliminary plat consists of platting the Back to the 50's Restaurant, <br /> Dean's Four Seasons, and Deano's Collision Center, along with Vance Street <br /> and four lots between Vance Street and the railroad tracks. The Ultimate <br /> preliminary plat includes an additional nine lots along Vance Street/174th Avenue, <br /> including the Riverview Sports Area. The APS property is excluded from both <br /> the Phase I and Ultimate preliminary plats. It will be necessary, however, in the <br /> Ultimate scenario to acquire a small piece of property to extend the street out to <br /> TH 10. <br /> 2. Both preliminary plats should provide drainage and utility easements along the <br /> created lot lines of the existing businesses. <br /> 3. There are two gas lines which cross Lot 1 in the southeast corner. The gas line <br /> company easement should be shown on both plats. <br /> 4. Lot 4 Block 1 in the Phase I scenario is exactly one acre in size; however, the <br /> grading plan shows that approximately 15% of the lot is used for a retention <br /> pond. <br /> 5. In the Phase I scenario, there are sanitary sewer and water main, a temporary <br /> cul-de-sac, and the retention pond outside of the platted area. There will need to <br /> be an easement provided for the construction of these improvements. <br /> • O:\PROJ\809020J\Ltr-061900-McPherson.doc <br /> 1326 Energy Park Drive • St. Paul, MN 55108 • 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.