My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2000
>
02-29-2000
>
5.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2025 10:23:07 AM
Creation date
5/7/2018 2:07:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) That Licensee is in strict compliance with all other terms, <br /> conditions and requirements of this License, including specifically, <br /> but not limited to,the operational requirements,performance <br /> standards and environmental monitoring requirements of sections <br /> 4, 6, 7, and 8; and the requirements of sections 17 and 25 to make <br /> prompt payment of all fees due to the City. No demolition debris <br /> may be accepted at the demolition debris landfill if this condition <br /> is not complied with. Licensee must immediately stop accepting <br /> demolition debris upon written notice from the City that there is a <br /> violation of this condition. <br /> (04) Other Related Operations. No other operations or activities, whether or <br /> not related to the Landfill, shall be permitted or allowed on the Landfill Property <br /> unless this License is first amended to specifically allow such operations and to <br /> specify the applicable conditions except mining activities or other operations <br /> licensed or permitted separately by the City. <br /> 4.) Specific Additional Operational Requirements. <br /> (01) Leachate Transmission Pipes. Licensee shall verify to the City every four <br /> (4) years that the existing leachate transmission pipes do not leak. <br /> (02) Backup Leachate Pumps. Licensee shall maintain backup pumps for use in <br /> the event of pump failure at the wet well and leachate storage tank on-site, or shall <br /> • maintain provisions for restoring temporary leachate pumping within a 24-hour <br /> period. <br /> (03) Leachate Holding Tank. Licensee shall ensure that the leachate holding <br /> tank is pumped out on a regular schedule. It shall be a violation of this License to <br /> allow leachate to collect on the liner to a depth exceeding one foot due to the <br /> leachate holding tank being full. <br /> (04) Gas Venting System. Licensee shall conduct active landfill gas venting <br /> accordance with approved plans and shall construct additional phases of the <br /> venting system at the time of final cover construction. <br /> (05) Comprehensive Monitoring Plan Phase IV Water Quality Monitr <br /> Work Plan. The Comprehensive Monitoring Plan Phase IV Water Qua' <br /> Monitoring Work Plan which describes the sampling frequency, paran <br /> protocols and reporting frequency for landfill gas, leachate, leachate pit <br /> leachate lysimeter, residential wells, groundwater monitoring wells ar <br /> water shall be updated annually to reflect changes in the monitoring <br /> monitoring plan shall yield adequate information for assessing the e <br /> the landfill gas control system in decreasing VOC contaminants it <br /> groundwater. The annual updates shall be approved by the City. <br /> • <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.