Laserfiche WebLink
There is one wetland in the southwest corner of the site, north of 221st Avenue. One <br /> hundred-forty feet of buffer will be maintained between this wetland and excavation <br /> • activities. <br /> TRAFFIC <br /> The attached permit limits Tiller to using US Trunk Highways 169 and 10 through Elk <br /> River, via 221st Avenue, which is paved. Highway 169 has acceleration lanes and <br /> protected turn lanes in both directions at its intersection with 221St Avenue. <br /> LAND SWAP <br /> Tiller is proposing to swap property with C.S. McCrossan Construction, Inc.. Tiller will <br /> give C.S. McCrossan property to the north of their current parcel, giving them access to <br /> 221st Avenue. McCrossan's will give Tiller property adjacent to the west boundary of <br /> their land lying south of 221St Avenue. Figure 2 and also the three maps in the attached <br /> application show the locations of the parcels being traded. <br /> Although the Tiller's property being traded is currently permitted for mineral excavation, <br /> C.S. McCrossan will need their own permit in the future to mine in this location. The <br /> property being given to Tiller from C.S. McCrossan is included in Tiller's amended <br /> permit. <br /> Additionally, Tiller's amended application includes a portion of property McCrossan is <br /> retaining ownership of. Tiller will mine this property and McCrossan will mine a portion <br /> of Tillers in the future. This arrangement is to make logical boundaries between these <br /> • properties, stopping the mining in a valley versus the top of a ridge. It may be many <br /> years between Tiller's mining and McCrossan's. The contour lines on the maps included <br /> in the application show this mining outside of the property boundaries. Mcrossan will be <br /> required to enter into Tillers conditional use permit as a consenting property owner. <br /> GROUND WATER <br /> Tiller is proposing to remain a minimum of five feet above water table with mining <br /> activities and the hot-mix plant. To mine closer to or into the water table raises <br /> additional concerns and requires an amendment to this permit. Washing of gravel has <br /> been purposely omitted from Tiller's site due to concerns that appropriating large <br /> amounts of water would cause contamination at the Elk River Landfill to migrate <br /> laterally faster. Other stipulations related to ground water can be found in the attached <br /> conditional use permit. <br /> HOURS OF OPERATION <br /> Tiller is requesting to the normal hours of operation for mineral excavation, which are <br /> 7:00 a.m. to 7:00 p.m., Monday through Saturday. They are asking that exceptions be <br /> made for the hot-mix asphalt plant when a paving job requires it. An example is State <br /> Highways, which are paved at night to avoid heavy traffic times. <br /> SETBACKS <br /> Tiller is proposing fifty foot setbacks adjacent to 221st Avenue and US Trunk Highway <br /> 169 and a two hundred foot buffer adjacent to the City's Railroad Hiking Trail. No <br /> • setback is proposed between Tiller's operation and the McCrossan property (which was <br />