Laserfiche WebLink
City of Elk River <br />Jackson Street Water Tower Condition Assessment August 3, 2015 <br />CDG Project # 15010.00 <br />OBSERVATIONS <br />40. The latticed <br />handrail around the <br />tank is in average <br />condition overall, <br />but features many <br />areas of chipped <br />paint and rust. <br />41. The four legs extend <br />inside the walkway <br />platform and are <br />connected with <br />steel angles and <br />Civets to the vertical <br />surface of the tank. <br />REFERENCE PHOTO <br />23 Co COLLABORATIVE DesignGroup,inc. <br />