Laserfiche WebLink
City of Elk River <br />Jackson Street Water Tower Condition Assessment August 3, 2015 <br />CDG Project # 15010.00 <br />OBSERVATIONS <br />38. Steel plates and <br />Civets beneath the <br />walkway platform <br />connect the <br />sections of steel <br />walkway plates. <br />The walkway has a <br />latticed steel <br />guardrail, which - <br />like the platform - is <br />weathered but in <br />average condition. <br />39. The latticed <br />handrail around the <br />tank is in average <br />condition overall, <br />but features many <br />areas of chipped <br />paint and rust. <br />REFERENCE PHOTO <br />22 COLLABORATIVE DesignGroup,inc. <br />