Laserfiche WebLink
<br />We feel the schedule for assessment should be the same as a comer lot parcel, whereby <br />the parcel is only assessed on the side the utility services are derived from. I have never <br />seen a double assessment for a comer lot. <br /> <br />We feel that we should be assessed for only Parcels #75-409-0430 and #75-409-0435 <br />.. th <br />totaling $12,000.00 for the 5 Street Reconstruction. <br /> <br />Mr. Terry Mauret, City Engineer, stated at the City Council Meeting that back in 1988 <br />Emmanuel Lutheran Church should have been assessed one additional unit. If this is the <br />case, then we would be agreeable to pay for the one unit, based on the unit cost at that <br />time of $2,800.00. <br /> <br />We hope and pray that you will consider our position in this double assessment concern <br />for Parcel #75-402-0246 before bringing it to the City Council for final assessment <br />approval. We are willing to sit down with you and work out the concerns to an amicable <br />conclusion before it is brought before the City Council for fmal adoption. <br /> <br />Respectfully, <br /> <br /> <br />).~~ <br /> <br />John N. Norgren <br />Head Elder for Emmanuel Lutheran Church <br /> <br />Cc: Elk River Mayor <br />City Council <br />Terry Maurer, City Engineer <br />Joan M. Schmidt, City Clerk <br />Kurt Dey, President of Emmanuel Lutheran Church <br />