My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. HPSR 04-26-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Heritage Preservation Commission
>
HPC Packets
>
2018
>
04-26-2018 SPECIAL
>
6.2. HPSR 04-26-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2018 12:22:35 PM
Creation date
4/24/2018 9:43:09 AM
Metadata
Fields
Template:
City Government
type
HPSR
date
4/26/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br /> TMI Coatings, Inc. <br /> 3291 Terminal Drive,St.Paul,Minnesota 55121-1610 Phone:651-452-6100 Fax:651-452-0598 <br /> Painting&Restoration Contractors <br /> Kodet Architectural Group,LTD. NOTE: This proposal may be withdrawn by TMI if <br /> Attention: John Brandel not accepted within 30 days. <br /> 15 Groveland Terrace <br /> Minneapolis, MN 55403 Date: February 23,2018 <br /> Phone 612-377-2737 <br /> E-mail ibrandel@kodet.com <br /> TMI Coatings, Inc.hereby provides budget pricing to repaint the 100,000-gallon lattice leg tower on Jackson <br /> Street in Elk River, MN. <br /> Scope: <br /> • Option 1—Wash and Paint <br /> o Power wash at 3,500 psi. <br /> o Spot clean and prime rusted areas. Includes up to 5%of surfaces only. <br /> o Apply two full top coats. <br /> • Option 2—Wash,Spot Repair,and Overcoat <br /> o Power wash at 3,500 psi. <br /> o Spot abrasive blast and prime rusted areas. Includes up to 20%of surfaces only. <br /> o Apply two full top coats. <br /> o Containment is priced as an option. <br /> • Option 3—Full Abrasive Blast and Recoat with Containment <br /> o Abrasive blast per SSPC-SP6 all exterior surfaces. <br /> o Apply a three-coat system. <br /> o Containment is priced as an option. <br /> • All options above include installing steel reinforcement at one leg where bowed and at one base plate <br /> foundation for additional reinforcement. <br /> • All options include the re-application of the tank logos. <br /> Pricing: <br /> A. Option 1-$153,000 <br /> B. Option 2-$193,000 <br /> C. Option 3-$385,000 <br /> NOTES: <br /> 1. Includes lead testing and abatement as required. <br /> 2. Prevailing wages are not included. <br /> 3. Bonds are not included. <br /> 4. Work to be scheduled during average temperature of 50°F and up. <br /> P:\Shared\Bid Package\FEBRUARY 2018\Elk River,MN 2-22-18\Elk River PROPOSAL.Doc <br /> ACCEPTANCE <br /> The undersigned hereby accepts TMI's proposal and authorizes TMI to furnish all materials and labor required to complete the work set forth in the <br /> proposal pursuant to the proposal terms and conditions set forth on the reverse side hereof,for which we agree to pay you the amount set forth in the <br /> proposal. If the proposal terms and conditions set forth on the reverse side hereof were not provided with transmission of TMI's proposal by facsimile, <br /> mail or email,the undersigned agrees to request a copy of the proposal terms and conditions before signing below. The undersigned agrees to be <br /> bound by the proposal terms and conditions set forth on the reverse side hereof regardless of whether the undersigned requested a copy or read <br /> them before signing below. <br /> Accepted: Date <br /> Respectfully, <br /> TMI Coatings,Inc. <br /> By By <br /> Title Title Ben Nicholson,Senior Estimator <br /> Customer: Sign and return copy. Retain original for your files. <br />
The URL can be used to link to this page
Your browser does not support the video tag.