Laserfiche WebLink
%"N <br /> SLACK TOM SLACK <br /> Painting PROPOSAL/QUOTE <br /> Tel 612-991 -6493 15886 SVEND LANE NW EMAIL: <br /> Fax 218-948-2328 EVANSVILLE, MN 56326 Slackpainting@gmail.com <br /> Q DATE: February, 26 2018 <br /> Elk River, MN, Legged water tank <br /> Option 1: Water Blast entire tank, Coat high rusted areas with Sherwin Williams 920 Pre <br /> Prime, followed by a coat of Macro 646, A final top coat of Aluminum Spray-Lastic, Final <br /> top coat of Flourokem on the roof, Logo Elk River Flourokem, Fix concrete inside legs, <br /> Structural repair. Reinforced poly will be laid out covering the ground underneath the <br /> tank and around the perimeter to contain any chips that may come off in the Water <br /> blasting process. Chips that are collected will be properly disposed of including <br /> paperwork to track disposal. <br /> $92,000 <br /> Option 2: Water Blast Entire Tank, Sand Blast SSPC-SP6 Wet Blast on extremely rusted <br /> areas only, estimated surface area Wet blasted < %10, two coats Sherwin Williams <br /> Macro 646, A final top coat of Aluminum Spray-Lastic, Final top coat of Flourokem on <br /> the roof, Logo Elk River Flourokem, Fix concrete inside legs, Structural repair. Disposal <br /> and containment would be the same as Option 1 <br /> $130,000 <br /> Option 3: Sandblast Entire Tank SSPC-SP6, 2 coats Macro, 1 coat Sherwin Williams Hi- <br /> solid poly. Fix concrete inside legs, Structural repair. Full tarp containment system <br /> would be utilized. Ground cover would be laid out around the perimeter of the <br /> containment system. Dust collector would be used inside the containment system. A <br /> wash station, PPE, Lead training, TCLP test would be included. Spent abrasive would be <br /> disposed of at the proper landfill with all the attached paperwork. <br /> $390,000 <br /> Thank you for allowing Slack Painting, LLC the opportunity to bid this project for you. The total bid price <br /> is based on the work reviewed; any alterations or unforeseen circumstances may result in an adjustment <br /> to the proposal total. Slack Painting is not responsible for moving or removing any materials or objects <br /> that interfere with the proposed work. If you have any additional questions or concerns please contact <br /> me directly. Thank you. <br /> Tom Slack <br />