My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1998
>
07-28-1998
>
4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2018 2:52:05 PM
Creation date
4/16/2018 2:52:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Minutes <br /> July 28, 1998 <br /> Page 3 <br /> • communication antenna tower and equipment building. The applicant is <br /> proposing to locate a 150 foot tall self supporting monopole on a 2 acre leased <br /> site on Lot 4, Block 2, of the Elk River Industrial Park, near the northeast corner of <br /> an existing building. Staff recommends approval of both requests based on the <br /> findings and conditions outlined in the staff report dated July 28, 1998. <br /> Chair Mesich opened the public hearing. <br /> Ken Nielson, representing U.S. West Wireless, reviewed other U.S. West Wireless <br /> antenna sites and why the Elk River location is needed to provide continuous <br /> coverage. Mr. Nielson requested that U.S. West be allowed to install connections <br /> from the tower at a lower height than recommended by staff. He also requested <br /> deletion of the condition to require painting of the accessory structures to match <br /> the existing building. He explained that the structures will be fenced blue slat will <br /> be installed in the fencing so that it will match the existing building. <br /> There being no further public comment, Chair Mesich closed the public hearing. <br /> COMMISSIONER KUESTER MOVED THE PLANNING COMMISSION RECOMMEND <br /> APPROVAL OF THE REQUEST BY U.S. WEST WIRELESS FOR REZONING TO ANTENNA <br /> OVERLAY DISTRICT, PUBLIC HEARING CASE NO. ZC 98-5, CONTINGENT UPON <br /> APPROVAL OF ORDINANCE AMENDMENT NO. OA 98-2, AND BASED ON THE <br /> FOLLOWING FINDINGS: <br /> • 1. THE REZONING IS COMPATIBLE WITH THE SURROUNDING LAND USES AND <br /> WOULD NOT ADVERSELY AFFECT THE PROPERTY UNDER CONSIDERATION FOR <br /> REZONING. <br /> 2. THE PROPOSED REZONING IS NECESSARY IN ORDER TO PROVIDE EFFECTIVE <br /> WIRELESS TELECOMMUNICATION COVERAGE FOR THE CITY. <br /> 3. THE REZONING IS IN ACCORDANCE WITH THE COMPREHENSIVE PLAN FOR <br /> THE CITY. <br /> COMMISSIONER THOMPSON SECONDED THE MOTION. THE MOTION CARRIED 7-0. <br /> COMMISSIONER KUESTER MOVED THE PLANNING COMMISSION RECOMMEND <br /> APPROVAL OF THE REQUEST BY U.S. WEST WIRELESS FOR A CONDITIONAL USE PERMIT, <br /> PUBLIC HEARING CASE NO. CU 98-16, WITH THE FOLLOWING CONDITIONS: <br /> 1. THE TOWER BE DESIGNED TO ACCOMMODATE 2 ADDITIONAL USERS. <br /> 2. FENCING SHALL BE 8 FEET TALL AND A COLOR TO MATCH THE EXISTING <br /> BUILDING. <br /> 3. THE TOWER SHALL BE A COLOR THAT BLENDS IN WITH THE SURROUNDING <br /> ENVIRONMENT. <br /> 4. NO SIGNS, LIGHTING OR ADVERTISING ARE ALLOWED ON THE TOWER. <br /> • 5. THE APPLICANT SHALL SUPPLY AN INTERMODULATION STUDY TO EVALUATE <br /> ANY POTENTIAL INTERFERENCE PROBLEMS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.