Laserfiche WebLink
OCT-23-199E 11:20 P.06/06 <br /> • Elk River Planning Commission <br /> October 23, 1998 <br /> Page 5 <br /> Indirect Source Permit <br /> Because of the number of parking stalls, this project will require an indirect <br /> source permit. The developers have not made application for this permit as of <br /> yet. It will be required prior to any activity on this project. <br /> D. Utilities <br /> The City is proceeding with the Eastern Area Trunk Utility Improvement, which will bring <br /> sanitary sewer and water through Elk River Crossing. These utilities will be adequate to <br /> sewer the proposed development. <br /> E. Miscellaneous <br /> It should be noted that this proposed development does include three properties <br /> not yet controlled by the developer. There are three single-family lots along <br /> CSAH 12 that the developer is negotiating with the owners for their acquisition. <br /> ?_. Drainage plans have been submitted and reviewed. They meet the necessary <br /> on-site ponding and limit the peak outflow from the site to an acceptable level, <br /> • They may have to be adjusted slightly as the developers rework the wetland <br /> plan. <br /> 3. The 2:1 slopes shown in the ponds are unacceptable according to City policy. <br /> They need to be 3:1 or flatter. Again, reworking the wetland plan may address <br /> this issue, since the Wetland Conservation Act is more restrictive than City <br /> policy. <br /> 4, There are a few more minor issues that will be dealt with prior to the next <br /> submittal. <br /> If you l— ve any questions, we will be in attendance at your Planning Commission meeting. <br /> Sincerely, <br /> Howard R. Green Company <br /> Terry J aurer, P.E. <br /> TJM/st <br /> • <br /> Howard R.Green Company <br /> 0;1PROJ‘.3o0112j102401112-2101.oct.doc CONSULTING ENGINEERS <br />