Laserfiche WebLink
OCT-23-1996 11:20 P.05/06 <br /> Elk River Planning Commission <br /> S Octobe- 23, 1998 <br /> Page 4 <br /> The County will likely need additional right-of-way from this development along <br /> CSAH 12. The City would require that the development construct a 10-foot <br /> bituminous pathway along CSAH 12, from the intersection of Tyler Street to <br /> Trunk Highway 169. This will tie into the pedestrian facilities anticipated along <br /> Tyler Street and the north side of CSAH 12, east of the intersection of Tyler <br /> Street. <br /> The interior right of way is shown at 60 feet. There is no street section indicated. <br /> We believe that this right-of-way is too small to accommodate a commercial <br /> access road. It should also accommodate a sidewalk to connect Main Street with <br /> Tyler Street. <br /> C. Environmental <br /> 1. Environmental Assessment Worksheet (EAW) <br /> The draft has been prepared and reviewed by City staff. The developer will be <br /> making the necessary changes and submitting the EAW to the City for signature <br /> and start of the public comment period. <br /> �. Wetlands <br /> • <br /> As indicated, a wetland report/mitigation plan has been prepared for the site. It <br /> was reviewed by the Technical Evaluation Panel (TEP). Comments were given <br /> to the developer. After the changes are made and received by the TEP, joint <br /> notification will be given. <br /> County Ditch <br /> Sherburne County Ditch No. 10 meanders through this site. It is the City's intent <br /> to construct a storm sewer system along the Tyler Street alignment, which will <br /> eventually allow the abandonment of Sherburne County Ditch No. 10. This is the <br /> same process that was used with another leg of County Ditch No. 10 on the west <br /> side of Trunk Highway 169. The issue that needs to be resolved will be one of <br /> timing. The City and the developer will have to work with Sherburne County to <br /> accommodate timing of the construction of the storm sewer system and the <br /> abandonment of County Ditch No. 10 with the proposed schedule of the <br /> development of Elk River Crossing, <br /> 4. Corps of Engineers <br /> This project will require a Corps of Engineers permit. It is our understanding that <br /> the application for this permit has already been made, and is working its way <br /> through the process. <br /> • <br /> Howard R. Green Company <br /> O:1PROJ\E 00112j10240\112.2101.oct.doc CONSULTING ENGINEERS <br />