My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1997
>
04-22-1997
>
5.3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2018 8:55:28 AM
Creation date
4/13/2018 1:00:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sent by: DOHERTY RUMBLE BUTLER 612 291 9313; 04/17/97 3:02PM;Je #563;Page 27/39 <br /> landfill if this condition is not complied with. Licensee must <br /> immediately stop accepting demolition debris upon written notice from <br /> the City that there is a violation of this condition. <br /> (04) Other Related Operations. No other operations or activities, whether or not <br /> related to the Landfill, shall be permitted or allowed on the Landfill Property unless <br /> this License is first amended to specifically allow such operations and to specify the <br /> applicable conditions except mining activities or other operations licensed or permitted <br /> separately by the City. <br /> 4.) Specific Additional operational Requirements. <br /> (01) Leachate Transmission Pipes. • .••.. .-• ••• . : • <br /> Litpabilitf.'I Licensee shall verify to the City every four (4) years that the existing {pipe <br /> does} jleachateiransmission pipes do] not leak. <br /> (02) Backup Leachate Pumps. Licensee shall maintain backup pumps for use in the <br /> event of pump failure at the wet well and leachate storage tank on-site, or shall <br /> maintain provisions for restoring temporary leachate pumping within a 24-hour period. <br /> • <br /> (03) Leachate Boldin Tank. Licensee shall ensure that the leachate holding tank is <br /> pumped out on a regular schedule. It shall be a violation of this License to allow <br /> leachate to collect on the liner to a depth exceeding one foot due to the leachate holding <br /> tank being full. <br /> (04) Gas Venting System. [Licensee shall conductl active <br /> landfill gas venting • • • • • , 4411. [in accordance with approved plans <br /> and shall construct additional phases of the venting system at the time of final cover <br /> construction.] <br /> (05) Comprehensive Monitorg Plan. LSebmit a} MO Comprehensive Monitoring <br /> Plan which describes the sampling frequency, parameters, protocols and reporting <br /> frequency for landfill gas, leachate, leachate piezometers, leachate lysimeter, <br /> residential wells, groundwater monitoring wells and surface water jshall be updated <br /> annually to reflect changes in the monitoring systemsl. The monitoring plan shall yield <br /> adequate information for assessing the effectiveness of the landfill gas control system in <br /> decreasing VOC contaminants in the groundwater. The • •• • • • • • <br /> •' annual updates <br /> • •. •, • i• • ••. • .• . •: • • r. • is • <br /> shall be approved by the City. <br /> • (06) Annual Gas Vent System Assessment. Annually assess the effectiveness of <br /> active landfill gas venting operations based on the results of groundwater and landfill <br /> 90976.2 8. <br />
The URL can be used to link to this page
Your browser does not support the video tag.