Laserfiche WebLink
Memo to the Planning Commission//CU 97--8 Page 4 <br /> April 22, 1997 <br /> 3. The proposed west entrance should be paved and include curb and gutter. <br /> • The improvements will be extended back to a line that is parallel to the front <br /> of the building. <br /> 4. The exterior of the proposed expansion of the existing building and the <br /> proposed new block production building will match the exterior of the <br /> existing building. <br /> 5. County approval shall be obtained prior to beginning construction on the <br /> proposed western driveway. All concerns and comments of the County <br /> Engineer shall be addressed on the site plan. <br /> 6. All comments and concerns outlined in the City Engineer's letter shall be <br /> addressed. <br /> 7. Completion of the paving and curbing shall be done in two phases. The <br /> entrances shall be completed by November 1, 1997 and the remainder of the <br /> interior area shall be completed by November 1, 1998. <br /> 8. Sight distance and visibility from the proposed driveway to the west shall <br /> be check and verified to ensure that no visibility problems exist. <br /> • <br /> • <br /> • <br /> s:\planning\scott\cu97-8.doc <br />