My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1997
>
04-22-1997
>
5.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2018 4:26:53 PM
Creation date
4/13/2018 12:45:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to the Planning Commission//CU 97--8 Page 4 <br /> April 22, 1997 <br /> 3. The proposed west entrance should be paved and include curb and gutter. <br /> • The improvements will be extended back to a line that is parallel to the front <br /> of the building. <br /> 4. The exterior of the proposed expansion of the existing building and the <br /> proposed new block production building will match the exterior of the <br /> existing building. <br /> 5. County approval shall be obtained prior to beginning construction on the <br /> proposed western driveway. All concerns and comments of the County <br /> Engineer shall be addressed on the site plan. <br /> 6. All comments and concerns outlined in the City Engineer's letter shall be <br /> addressed. <br /> 7. Completion of the paving and curbing shall be done in two phases. The <br /> entrances shall be completed by November 1, 1997 and the remainder of the <br /> interior area shall be completed by November 1, 1998. <br /> 8. Sight distance and visibility from the proposed driveway to the west shall <br /> be check and verified to ensure that no visibility problems exist. <br /> • <br /> • <br /> • <br /> s:\planning\scott\cu97-8.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.