Laserfiche WebLink
(24) "Wetland" means land which is annually subject to periodic or continual inundation by • <br /> water and commonly referred to as a bog, swamp, or marsh. <br /> 906.04-ADMINISTRATION <br /> 1. Permits Required. <br /> A,/ A permit is required for the construction of structures or structure additions (and <br /> including such related activities as construction of decks and signs), the installation and/or <br /> alteration of sewage treatment systems, and the grading and filling of the natural topography. <br /> Application for a permit shall be made to the Building and Zoning Administrator on the <br /> forms provided. The application shall include the necessary information so that the Building <br /> and Zoning Administrator can determine the site's suitability for the intended use and that a <br /> compliant sewage treatment system will be provided. <br /> B. j/ Permits shall stipulate that any identified nonconforming sewage treatment system, as <br /> defined by Section 906.10 (3) shall be reconstructed or replaced in accordance with the <br /> provisions of this Ordinance. <br /> 2. Certificate of Zoning Compliance - The Building and Zoning Administrator shall issue a <br /> certificate of zoning compliance for each activity requiring a permit as specified in 906.04 (1) of this <br /> Ordinance. This certificate will specify that the use of land conforms to the requirements of this <br /> Ordinance. Any use, arrangement, or construction at variance with that authorized by permit shall <br /> be deemed a violation of this Ordinance and shall be punishable as provided in Section 906.02 (3) <br /> of this Ordinance. <br /> 3. Certification. • <br /> A re Certain land use decisions which directly affect the use of land within the designated <br /> and use districts and involve any of the following actions must be certified by the <br /> Commissioner as described in Section 906.04(4): <br /> i. Adopting or amending an ordinance regulating the use of land, including rezoning <br /> of particular tracts of land. <br /> ii. Granting a variance from a provision of this ordinance which relates to the zoning <br /> dimension provisions of this ordinance. <br /> iii. Approving a plat which is inconsistent with this ordinance. <br /> B, ( No such action shall be effective until the Commissioner has certified that the action <br /> complies with the Minnesota Wild and Scenic Rivers Act, the statewide standards and <br /> criteria, and the management plan. <br /> 4. Certification Procedure. <br /> q p A copy of all notices of any public hearings, or where a public hearing is not required, a <br /> copy of the application to consider zoning amendments,variances, or inconsistent plats under <br /> this ordinance shall be sent so as to be received by the Commissioner at least 30 days prior to <br /> such hearings or meetings to consider such actions. The notice or application shall include a <br /> copy of the proposed ordinance or amendment, or a copy of the proposed inconsistent plat, <br /> or a description of the requested variance. <br /> 4 <br />