My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5 PCSR 10-24-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
10-24-1995
>
5.5 PCSR 10-24-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 3:07:24 PM
Creation date
4/6/2018 3:07:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(r A. ITEM NO. 5.5 <br /> City of <br /> 411E1k MEMORANDUM <br /> River <br /> TO: Planning Commission <br /> FROM: Steven B. Ach, City Planner , <br /> DATE: October 24, 1995 <br /> SUBJECT: Conditional Use Permit Request by <br /> Novco, Inc., Public Hearing Case No. <br /> CU 95-23 <br /> Request <br /> Novco, Inc. is requesting a conditional use permit to construct a second <br /> principal structure and operate a truck terminal on an industrial lot in Rail <br /> 10 Industrial Park. <br /> Background <br /> • This item was presented to the Planning Commission on September 26th. <br /> The Planning Commission tabled this item until the October 24th meeting to <br /> allow the applicant an opportunity to prepare a site plan illustrating the <br /> existing and proposed improvements to the property. Since the Planning <br /> Commission meeting, the applicant has submitted a plan to staff outlining <br /> the existing conditions, as well as the improvements they would like to <br /> install. <br /> Please refer to the attached Planning Commission report dated September <br /> 26, 1995, for additional information on this particular request. <br /> Revised Site Plan <br /> Attached are two exhibits for the Planning Commission's consideration. The <br /> first is a plan submitted by the applicant (Novotnys) illustrating the existing <br /> conditions and the improvements that they would like to install. The second <br /> exhibit is the same site plan with some modifications made by staff that will <br /> be recommended to the Planning Commission. The two primary differences <br /> between the plans submitted by Novotnys and staff's recommended plan is <br /> the following: (1) As outlined at the last Planning Commission meeting, <br /> Novotny's current parking area consists of both a bituminous surface as well <br /> • <br /> 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.