My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.10 PCSR 06-27-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
06-27-1995
>
5.10 PCSR 06-27-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 2:05:05 PM
Creation date
4/6/2018 2:04:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. B. Erosion and sediment control measures shall be <br /> coordinated with the different stages of development . <br /> Appropriate control measures shall be installed prior to <br /> development when necessary to control erosion. <br /> C. The smallest practical increment of land shall be <br /> exposed at any one time during development. <br /> D. When soil is exposed, the exposure shall be for the <br /> shortest feasible period of time, but not longer than sixty <br /> (60) days. <br /> E. Where the topsoil is removed, sufficient aerable soil <br /> shall' be set aside for respreading over the developed area. <br /> The soil shall be restored to a depth of four (4) inches and <br /> shall be of a quality at least equal to the soil quality <br /> prior to development. <br /> F. Critical erosion areas exposed during construction <br /> shall be protected with temporary vegetation, mulching or <br /> other acceptable means . <br /> G. Sediment basins (debris basins, desilting basins, or <br /> • silt traps) shall be installed and maintained to remove <br /> sediment from runoff waters from land subject to earth <br /> disturbance activities . <br /> H. Diversions shall be installed to divert surface water <br /> runoff from slopes of ten percent (10%) or steeper. <br /> I . Provisions shall be made to effectively accommodate <br /> increased runoff from slopes of ten percent (10%) or <br /> steeper. <br /> J. Cut and fill slopes shall not be steeper than three <br /> feet horizontal to one foot vertical (3 : 1) unless stabilized <br /> by a retaining wall, rip-rap, or other acceptable means . <br /> K. During grading operations, necessary measures for dust <br /> control, as required by the City, shall be implemented. <br /> 9 . Drainage. The natural drainage system shall be used to the <br /> maximum extent feasible for the storage and flow of runoff. <br /> The design of the drainage system shall conform to the City' s <br /> overall storm water management plan. The following <br /> requirements shall also apply: <br /> 111 <br /> 10.37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.