Laserfiche WebLink
• Building `E' is designed with approximately nine individual bays that are smaller than <br /> those found in Buildings 'B' and 'C' located on each side of the Target store. Each of the <br /> bays are 50' in depth with varying widths of 20' to 40'. <br /> A majority of the improvements to serve the new building, such as the parking and <br /> utilities have already been installed as part of Phase I. However, there will need to be <br /> some minor improvements along with the construction of the 16,000 square foot building. <br /> SITE PLAN REVIEW <br /> The following is a list of comments from staff regarding the proposed 16,000 square foot <br /> building. <br /> • Parking and Circulation <br /> 1. The service drive on the south side of the building will have to be properly <br /> signed to prevent parking from occurring. This driveway is approximately <br /> twenty feet in width--since this is primarily a"service drive"the narrow drive <br /> should not be a problem. <br /> 2. The plans indicate that all parking areas will be bounded with concrete curb <br /> and gutter, which is consistent with the standards outlined for the Elk Park <br /> • Center Development. <br /> 3. The required parking for this building was determined when the master <br /> development plan was approved. <br /> • Refuse Collection <br /> 1. The plans indicate that both trash enclosures will be constructed of a masonry <br /> material, which compliments the 16,000 square foot building. Staff <br /> recommends that these enclosures be large enough to accommodate general <br /> trash collection, as well as recyclable materials. <br /> 2. Enclosures shall be properly screened with appropriate landscaping. <br /> 3. Consideration should be given to designing the enclosures with convenient and <br /> easy pedestrian access. <br /> • Signage <br /> Attached is a proposed signage package for"Building E". This package is <br /> consistent with the Elk Park Center PUD agreement with the exception of the 20 <br /> foot wide bays. <br /> • <br /> s:planning:pc:cu95-07 <br />