My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1 PCSR 05-23-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
05-23-1995
>
5.1 PCSR 05-23-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2018 9:58:08 AM
Creation date
4/6/2018 1:16:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Planning Commission Page 4 <br /> May 23, 1995 <br /> • F. Drainage and Utilities <br /> 1. Refer to the City Engineer's memo dated May 17, 1995 for <br /> additional comments. <br /> 2. Appropriate erosion control shall be utilized during construction. <br /> G. Building Elevations <br /> The proposed building consists of a decorative rock-faced block along <br /> with accent bands of smooth concrete block. Video Update's color <br /> scheme is primarily a white building with red accent bands. The <br /> Planning Commission may recall one of the elements in the Planned <br /> Unit Development was to maintain some architectural consistency <br /> throughout the development. One of the prominent building materials <br /> used on the Target building and each of the multi-tenant buildings <br /> (Buildings B and C) on each side of Target is a brick material. This <br /> same material has been incorporated into a couple of the free-standing <br /> buildings (First National Bank and Wendy's). This brick material has <br /> not only provided some consistency in the type of masonry material use <br /> • in the development, but also maintained the earthtone color scheme. <br /> Staff would suggest the proposed Video Update building accomplish <br /> one of the following two: <br /> • The proposed color scheme be modified to be more consistent with <br /> the predominant earthtone colors that are being used throughout <br /> the development; or, <br /> • Incorporate a similar brick material providing the continuity <br /> discussed in the planned unit development agreement. <br /> H. Signage <br /> 1. Attached is a proposed monument-style sign for Video Update. <br /> This particular sign design is consistent with the planned unit <br /> development agreement for Elk Park Center and is the same <br /> type of sign that has been approved with other free-standing <br /> sites in the development. <br /> I. Lighting <br /> i1. On-site lighting should consist of a similar lighting design found <br /> s:planning:pc:cu95-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.