My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6 PCSR 02-28-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
02-28-1995
>
5.6 PCSR 02-28-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 12:52:53 PM
Creation date
4/6/2018 12:52:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> . 11St <br /> COASFLTI\C EN'CIREEILS <br /> February 22, 1995 <br /> 1326 Energy Park Drive File: 230-263-11 <br /> St.Paul,MN 55108 <br /> 612-644-4389 <br /> 1.800-888-2923 Mr. Steve Ach <br /> Fax:612-644-9446 City Planner <br /> City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River, MN 55330 <br /> RE: ICE ARENA SITE PLAN REVIEW <br /> Dear Mr. Ach: <br /> As requested, we have reviewed the site plan package put together by RSP Architects for <br /> CIVIL ENGINEERING.. the addition to the Elk River Ice Arena. Based on our review of this material, we would <br /> ENVIRONMENTAL offer the following comments: <br /> �UNICIPAI <br /> "NTNG 1. The lot dimensions shown on the site/landscape plan are slightly different than those <br /> SOLID WASTE shown on the survey and description provided on the last sheet entitled "Existing <br /> STRUCTURAL Conditions of Elk River Ice Arena". It appears that if the legal description is <br /> SURVEYING correct, the site plan should show slightly larger dimensions which would improve <br /> TRAFFIC <br /> the building situation. <br /> TRANSPORTATION <br /> ELECTRICAL/MECHANICAL 2. Although no drainage calculations were provided, the grading plan does indicate <br /> ENGINEERING: two small sedimentation ponds adjacent to the wetland east of the site. The most <br /> HVAC southerly of these sedimentation ponds has drainage flowing in via storm sewer <br /> POWER DISTRIBUTION piping. The more northerly of the two has drainage that will flow overland off of <br /> SCADA the parking lot. These appear to be adequate to address the quality control issue of <br /> SYSTEM CONTROLS storm water runoff. It should be noted that neither of these should be built within <br /> the wetland area itself. Both need to be outside and upland of the designated <br /> wetland area. <br /> 3. It is not clear from the drawings, but I assume that the entire parking area will <br /> include concrete curb and gutter around its perimeter. <br /> 4. No handicap stalls are shown in the parking area; therefore, I have assumed that <br /> these will be located in the existing parking area located south of the new and the <br /> � <br /> FFICES IN: existing ice arena buildings. <br /> ,MINNEAPOLIS <br /> PRIOR LAKE <br /> ST.PAUL <br /> WASECA <br />
The URL can be used to link to this page
Your browser does not support the video tag.