My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5 PCSR 04-27-1993
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1993
>
04-27-1993
>
5 PCSR 04-27-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 9:46:42 AM
Creation date
4/2/2018 9:46:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
automatically adopted and made part of this License. City <br /> staff may require testing for emissions as necessary, but no <br /> 111 <br /> less than once per year. <br /> (04) Reimbursement for City Review of Proposal . ConTeck <br /> shall reimburse the City for all reasonable costs incurred <br /> for issuing, reviewing and enforcing this License within 30 <br /> days of invoice. <br /> (05) Parameters fox Contaminates in Soil to 12e Accepted at <br /> the Facility. This License incorporates MPCA standards for <br /> acceptable contaminates in soil . Contaminates prohibited <br /> from being accepted at the ERL according to the Industrial <br /> Waste Management Plan are also prohibited for this Facility. <br /> The Facility and/or alternate facility is allowed to process <br /> only petroleum contaminated soil. Soils which are <br /> contaminated with other materials, including, but not limited <br /> to, chlorinated organics, creosotes or ammonia, are not <br /> allowed to be processed. Prior to the acceptance of soils , <br /> soils shall be tested7 and the results of the testing copied <br /> to City staff,, with City staff shall have+ng authority to <br /> deny for good cause the acceptance of any contaminated soils . <br /> (06) Testing Schedule for Residues . The residue from any <br /> r.y-:, cyclone separator and the sludge from settling tanks shall be <br /> tested once per week for certain indicator hydrocarbons and <br /> lead. Citystaff has the discretion to indicate what types <br /> 0 f -;. of contaminates are tested for and to modify the testing <br /> 4,7 ,77.../ schedule as deemed appropriate-, and shall have the authority <br /> 7z4 ''''J,_' to specify an appropriate testing program and schedule for an <br /> ;` "` alternate facility. The minimum testingfor these residues <br /> :,�.. ;,; .. ; is once every 160 hours of operation by the Facility. <br /> i <br /> _ -,i.w.7 , (07) Definition of Treated Soil . City incorporates the <br /> A. ,... MPCA' s standards to define "treated soil . " <br /> (08) Maximum Size Limit for Stockpile of Treated Soil on <br /> Site. ConTeck may store up to 10, 000 cubic yards of treated <br /> soil with City staff having the discretion to limit the <br /> stockpile to whatever amount is needed to control fugitive <br /> dust (including no stockpile) . <br /> (09) Hours of Operation. The hours of operation are from <br /> 7 : 00 a.m. to 5 : 30 p.m. on weekdays and 7 : 00 a.m. to 4 :30 p.m. <br /> on Saturdays. <br /> (10) Fugitive Dual. The City incorporates MPCA' s standards <br /> regarding fugitive dust, ,and ConTeck' s proposal (dated <br /> February 5, 1990, and supplementary letter dated April 15, <br /> 1990) shall be incorporated into this License with City staff <br /> having the discretion to require additional measures to <br /> control fugitive dust if needed. <br /> • <br /> 4 . <br /> 9 'd G l9GG l 090b 'ON / 99 : 0l E6 ,GE . (f1Hi) NiW1E NVNEEOH 00IADE <br />
The URL can be used to link to this page
Your browser does not support the video tag.