My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.5. SR 04-11-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
04/11/2005
>
3.5. SR 04-11-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:43 AM
Creation date
4/8/2005 10:07:42 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/11/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Apr-05-2005 12:33pm Fru.-FOREST LAKE CONTRACTING . <br /> <br />+6514644722 <br /> <br />T-459 P.002/004 F-304 <br /> <br /> <br />REQUEST FOR PROPOSAL <br /> <br />PROJECT OVERVIEW <br />The City of Elk River'is l;Uttently requesting proposals from qualified :6:r:ms fOJ: the design <br />and const1:uccion of a 240' by 360' sOcceJ:/ football field located at the Elk River Youth <br />Athletic:. CQttJ.pI.ex, 9950165- NW, Elk River MN 55330. The site is rela.tivdy flat with <br />sandy, well draining 5oil. It is assumed that e1cisttng soil will be suitable for ut'lC. <br /> <br />REQUIREMENTS <br />The qualified fu:m must have experience of building and designing athletic fields with a list <br />of .references. References should be submitted to the city for review with this propo:sal. <br />Engineering and! or cOl1strUction Uxms must specify which fields they designed built or both <br />designed and built. <br /> <br />Desig,n/Construction firms sball COVel a. minimum scope of the following item$ and shall <br />submit pricing in the following bre2kout for the cities review'; <br /> <br />1. Engineering services [0 incll1de at a miohnum: . <br />Survey topography, constmction plan design and deveIopmel1t, plan review, and pla.n <br />submittals. . <br />Finn shall submir qualifications of key ertgin~g penonnel. <br />.$ ~ 600.00 <br /> <br />2. Erosion control to inclode: at a minimum: <br />-silt fence, rock construction Ctltl:2.nCe., stJ:eet SW'eepmL . <br />. $::> 0t:lC0 _00 <br />3. Site remov~s to include nt: a minimum:' , <br />Silt fence temoval, clearing a.nd grubbing. <br /> <br />$ S-oc. .. eo <br />4. Field construction to include at a. minh:num: <br />Supemsion, common cxc.nvadon. bean COnBtrI.lctiOI1. finish grading. f <br /> <br />14 ~r(l,O <br />/ <br /> <br />TOTAL COST FOR FIELD CONSTRUCTION <br />. d. $.:21/900.op <br />Sip- ~L ~ n.'"~/~fs <br />r Sa. t:1~ UTn'L A <br /> <br />~~.+'n:. k"ce. -;0 /?c no. .q-;u:. <br />~P& Ie... 1~1'1=> h~i..e? <br />
The URL can be used to link to this page
Your browser does not support the video tag.